FederalOH
Posted
Oct 1, 2026
Oct 15, 2026
Circuit Card Assembly (Request For Quotation) Hill Afb
Provide circuit card assembly. NSN 5998015611684. Qty 30 UI EA.
Description: Monthly and annual inspection, maintenance, and monitoring of portable fire extinguishers, and annual fire suppression system inspection.
Federal · OK, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Adjacent opportunities open for bidding right now.
FederalOH
Posted
Oct 1, 2026
Oct 15, 2026
Provide circuit card assembly. NSN 5998015611684. Qty 30 UI EA.
FederalDC
Posted
-
Oct 30, 2026
The Department of the Air Force seeks monthly and annual inspection, preventive maintenance, testing, tagging, and electronic monitoring of approximately 1,316 portable fire extinguishers at Hill AFB, as well as annual inspection and certification of fire suppression systems at seven facilities. The work includes replacement extinguishers, hydrostatic testing, barcode tracking, and electronic reporting; it is a 100% small-business set-aside with Utah State Fire Marshal licensing and certification requirements. The agency intends to establish a one-year BPA with four option years, and quotes are due by noon Mountain Daylight Saving Time on October 30, 2026.
Bureau of Engraving and Printing
FederalDC
Posted
Oct 1, 2026
Oct 19, 2026
The contract shall ensure all portable fire extinguishers located at the BEP are maintained and serviced to be readily available and function reliably in accordance with NFPA-10, Standard for Servicing Portable Fire Extinguishers, and any others applicable regulations and mandates.
FederalDC
Posted
Aug 12, 2026
Oct 15, 2026
he work includes demolition of existing structures, installation of new concrete features, upgraded family and tent campsites, improved water and sewer infrastructure, roadway and drainage enhancements, rock and retaining wall construction, fencing and gates, new signage, and site restoration including grading, surfacing, and seeding. The project aims to enhance visitor safety, accessibility, and resource protection while preserving the forest’s natural character.