Transportation District Commission Of Hampton Roads
Special DistrictVA
Posted
Nov 18, 2026
Dec 17, 2026
Description: Seeking qualified contractors to complete the turn-key upgrade and replacement of six (6) schnider electric uniflair chilled water in-row cooling towers.
SpecialDistrict · VA, US
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from Transportation District Commission Of Hampton Roads.
Adjacent opportunities open for bidding right now.
Transportation District Commission Of Hampton Roads
Special DistrictVA
Posted
Nov 18, 2026
Dec 17, 2026
Hampton Roads Transit (HRT) is seeking a qualified Contractor to complete the turn-key upgrade and replacement of six (6) Schnider Electric Uniflair Chilled Water In-Row Cooling Towers .
Ventura Unified School District
School DistrictCA
Posted
Dec 21, 2025
Jan 22, 2027
Work consists of replace existing low slope roofing with KEE-Stone roofing system. Replace existng shingle roofing with new dimensional shingles and R-Mer seal underlayment. Replace metal roof with cool sil metal restoration system.
Ventura Unified School District
School DistrictCA
Posted
-
Jan 22, 2027
Work consists of replace existing low slope roofing with kee-stone roofing system. Replace existing shingle roofing with new dimensional shingles and r-mer seal underlayment. Replace metal roof with cool-sil metal restoration system.
Higher EducationCA
Posted
Nov 18, 2026
Dec 16, 2026
Work consists of repairing one PV structure (SSS-44) in Parking Lot 18 west, which was damaged during a windstorm. Two (2) of the four (4) footing/column/beam assemblies of the array will be reused and two (2) will be abandoned/removed with three new assemblies. All purlins and solar panels are being removed and replaced with same type of purlins and solar panels as originally installed. All inverters and associated equipment to be reused. Solar panels provided by owner. All concrete and asphalt damaged or removed during construction to be restored to match existing. All waste to be disposed of by contractor. The panels in the scope of work are LG Neon 2 405W Model LG405N2W-V5 with a standard string inverter (carport). The project must also comply with AQMD rule 403 (dust control). OWNER shall award the contract for the Project to the lowest responsible Bidder submitting a responsive bid as determined by the OWNER from the BASEBID ALONE. OWNER reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding process.