Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work shall consist of drainage improvements, concrete curb/sidewalk, pavement milling, and paving. Work includes the following approximate quantities: 19,000 SY of pavement milling, and 1,950 tons of hot mix asphalt material, 6,600 LF of concrete curb, 840 SY of concrete sidewalk and driveways, drainage improvements, together with miscellaneous related work items.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes New Detention Pond and drainage channel grading, approximately 250 LF of new Limestone Block Retaining Wall, Concrete and Stone Rip Rap, approximately 180 LF of 24" RCP storm sewer, three (3) 4'x4' Precast Concrete Junction Box, Concrete Headwall, Precast concrete 6:1 safety end treatment, SWPPP installations and traffic control.
Posted Date
Dec 29, 2025
Due Date
Jan 27, 2026
Release: Dec 29, 2025
Close: Jan 27, 2026
Work includes New Detention Pond and drainage channel grading, approximately 250 LF of new Limestone Block Retaining Wall, Concrete and Stone Rip Rap, approximately 180 LF of 24" RCP storm sewer, three (3) 4'x4' Precast Concrete Junction Box, Concrete Headwall, Precast concrete 6:1 safety end treatment, SWPPP installations and traffic control.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of services and materials for the Huntwick II Stormwater Infrastructure Improvements Phase 1 Project.
Posted Date
Dec 9, 2025
Due Date
Jan 13, 2026
Release: Dec 9, 2025
Close: Jan 13, 2026
Procurement of services and materials for the Huntwick II Stormwater Infrastructure Improvements Phase 1 Project.
AvailableDemolition of existing facilities, overhead utility lines and poles relocation, excavation, construction of reinforced concrete pipes, catch basins and inlets, grading, removal & replacement of asphalt concrete pavement, asphalt concrete overlay and concrete flatwork improvements (sidewalks, curb and gutters, curb ramps, bus pads, and driveways) landscaping, irrigation, installation of sound walls, water quality bmps, installation of traffic signals, traffic signals modifications and signing & striping, street lights, improvements.
Posted Date
Dec 23, 2025
Due Date
Jan 26, 2026
Release: Dec 23, 2025
Close: Jan 26, 2026
Demolition of existing facilities, overhead utility lines and poles relocation, excavation, construction of reinforced concrete pipes, catch basins and inlets, grading, removal & replacement of asphalt concrete pavement, asphalt concrete overlay and concrete flatwork improvements (sidewalks, curb and gutters, curb ramps, bus pads, and driveways) landscaping, irrigation, installation of sound walls, water quality bmps, installation of traffic signals, traffic signals modifications and signing & striping, street lights, improvements.
AvailableProject includes, but is not limited to: saw cutting, removal and disposal of existing asphalt, curb and sidewalk; salvaging the existing road base; asphalt milling; installation of new potable water main and reconnecting services; installation of new storm sewer; trench backfill; street, curb and sidewalk subgrade; concrete curb; asphalt sidewalk; asphalt roadway; and landscape restoration.
Posted Date
Dec 10, 2025
Due Date
Feb 5, 2026
Release: Dec 10, 2025
Close: Feb 5, 2026
Project includes, but is not limited to: saw cutting, removal and disposal of existing asphalt, curb and sidewalk; salvaging the existing road base; asphalt milling; installation of new potable water main and reconnecting services; installation of new storm sewer; trench backfill; street, curb and sidewalk subgrade; concrete curb; asphalt sidewalk; asphalt roadway; and landscape restoration.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →