Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Contract work includes spot curb and drainage improvements for Molinari Drive. Principal items of work in the project include: · 10 Uunit Inlet, Type A 799 LF of 12" Reinforced Concrete Pipe, Class V; 125 LF Underdrain, Type F; 2,085 LF of 9" x 18" Concrete Vertical Curb.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Rehabilitation will consist of adjusting roadway grades and cross slopes; replacing deteriorated curbing, driveway aprons, curb ramps, and sidewalks as needed; and installing new storm sewer structures.
Posted Date
Jan 9, 2026
Due Date
Feb 5, 2026
Release: Jan 9, 2026
Close: Feb 5, 2026
Rehabilitation will consist of adjusting roadway grades and cross slopes; replacing deteriorated curbing, driveway aprons, curb ramps, and sidewalks as needed; and installing new storm sewer structures.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide street improvements that also includes 1 ls clearing & grubbing (includes removal and reinstallation of signs and mailboxes); 1,190 SY remove existing roadway including existing curb; 650 SY earthwork/ excavaton for pavement widening; 700 SY yard restoration (4" topsoil, seed and mulch); 1 ls erosion & water pollution control; 1,840 SY 7" gravel base, crushed stone base; 250 SY geogrid reinforcement for subgrade repair (tensar bx 1200 or equivalent; 1,420 SY asphalt pavement surface course w/ aramid fiber reinforcement (forta-fi or ace fiber) (2"). See outside link.
Posted Date
Jan 22, 2026
Due Date
Feb 12, 2026
Release: Jan 22, 2026
Close: Feb 12, 2026
Provide street improvements that also includes 1 ls clearing & grubbing (includes removal and reinstallation of signs and mailboxes); 1,190 SY remove existing roadway including existing curb; 650 SY earthwork/ excavaton for pavement widening; 700 SY yard restoration (4" topsoil, seed and mulch); 1 ls erosion & water pollution control; 1,840 SY 7" gravel base, crushed stone base; 250 SY geogrid reinforcement for subgrade repair (tensar bx 1200 or equivalent; 1,420 SY asphalt pavement surface course w/ aramid fiber reinforcement (forta-fi or ace fiber) (2"). See outside link.
AvailableSmart scale - turn lane improvements - excavation, storm sewer pipe, aggregate base material, asphalt concrete, saw-cut asphalt concrete full depth, pavement marking, signs, portable temporary rumble strip array.
Posted Date
Jan 13, 2026
Due Date
Feb 25, 2026
Release: Jan 13, 2026
Close: Feb 25, 2026
Smart scale - turn lane improvements - excavation, storm sewer pipe, aggregate base material, asphalt concrete, saw-cut asphalt concrete full depth, pavement marking, signs, portable temporary rumble strip array.
AvailableThe milling and resurfacing of Malcolm Avenue from Industrial Avenue to Borough limits. Contract work also includes minor curb and sidewalk improvements, ADA curb ramp reconstruction, and the resetting of existing castings. Base Bid 2 – United Lane Improvements The milling and resurfacing of United Lane from Malcolm Avenue to Bergen County Animal Shelter. Contract work also includes minor curb improvements, replacement of regulatory and warning signs, and reconstruction of inlets. Principal items of work in the project include: Base Bid 1: 4,520 SY HMA Milling, 3" or Less; 670 TON Hot Mix Asphalt 9.5M64 Surface Course; 425 LF of 9" x 18" Concrete Vertical Curb. Base Bid 2: 2,850 SY HMA Milling, 3" or Less; 420 TON Hot Mix Asphalt 9.5M64 Surface Course; 260 LF of 9" x 18" Concrete Vertical Curb.
Posted Date
Jan 13, 2026
Due Date
Feb 4, 2026
Release: Jan 13, 2026
Close: Feb 4, 2026
The milling and resurfacing of Malcolm Avenue from Industrial Avenue to Borough limits. Contract work also includes minor curb and sidewalk improvements, ADA curb ramp reconstruction, and the resetting of existing castings. Base Bid 2 – United Lane Improvements The milling and resurfacing of United Lane from Malcolm Avenue to Bergen County Animal Shelter. Contract work also includes minor curb improvements, replacement of regulatory and warning signs, and reconstruction of inlets. Principal items of work in the project include: Base Bid 1: 4,520 SY HMA Milling, 3" or Less; 670 TON Hot Mix Asphalt 9.5M64 Surface Course; 425 LF of 9" x 18" Concrete Vertical Curb. Base Bid 2: 2,850 SY HMA Milling, 3" or Less; 420 TON Hot Mix Asphalt 9.5M64 Surface Course; 260 LF of 9" x 18" Concrete Vertical Curb.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →