IFB IGSA #26-05 Building 179 NEC HVAC Replacement
Project requirement is to replace the existing 15-ton heat pump system, hot water coil auxiliary heat, and all associated ductwork serving the Network Enterprise Command (NEC) administrative Building #179 with a new 10-ton heat pump/propane furnace system and all new ductwork.