Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
CAL FIRE is soliciting bids to repair and replace the existing electrical system at the Siskiyou Unit Headquarters and Fire Station. The project includes providing all materials, labor, equipment, and permits required for the electrical panel upgrade as detailed in the project plans. A mandatory pre-bid conference is scheduled for February 10, 2026, at the project site in Yreka, California.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The California Department of Forestry and Fire Protection (CAL FIRE) issued IFB 2CA07654 to upgrade the electrical panels at the Weed Fire Station (Shasta-Trinity Unit). The work includes providing all materials, labor, equipment, permits and installation per the Sample Agreement, Exhibit A (Detailed Scope) and Attachment 3 (Plans). A mandatory pre-bid conference is scheduled on 2026-02-10 at the Weed Fire Station, and bids are due 2026-02-20.
Posted Date
Jan 23, 2026
Due Date
Feb 20, 2026
Release: Jan 23, 2026
Close: Feb 20, 2026
The California Department of Forestry and Fire Protection (CAL FIRE) issued IFB 2CA07654 to upgrade the electrical panels at the Weed Fire Station (Shasta-Trinity Unit). The work includes providing all materials, labor, equipment, permits and installation per the Sample Agreement, Exhibit A (Detailed Scope) and Attachment 3 (Plans). A mandatory pre-bid conference is scheduled on 2026-02-10 at the Weed Fire Station, and bids are due 2026-02-20.
AvailableWork consists of security control panel upgrade project.
Posted Date
Jan 23, 2026
Due Date
Feb 18, 2026
Release: Jan 23, 2026
Close: Feb 18, 2026
Work consists of security control panel upgrade project.
AvailableConstruct the MOC generator upgrade.
Posted Date
-
Due Date
Jan 29, 2026
Release: -
Close: Jan 29, 2026
Construct the MOC generator upgrade.
AvailableProvide construction services for PEP panel and System upgrades to aging PEP systems. Remove and replace the following components from the existing PEP system: Pump and discharge piping within the tank: All floats. All associated low-voltage and high-voltage wiring. Existing electrical panel. Interior tank splice box. Transport all removed components to the City Utility site for disposal (no off-site disposal allowed). Install and anchor a new City-supplied PEP electrical control panel on the exterior of the residence. Repair minor stucco damage when caused during panel removal or installation. Installation of PEP pump and Panel: Ensure panel installation meets electrical code requirements and City Utility standards. Confirm generator adapter compatibility and ensure unobstructed access for Utility personnel. Install the City-supplied pump and plumb discharge piping to match existing configuration within the tank. Install new floats and wiring as required. Run new double-insulated wiring through the existing ¾” conduit using fish tape. Connect all electrical components into the new panel and ensure proper labeling.
Posted Date
Jan 21, 2026
Due Date
Feb 19, 2026
Release: Jan 21, 2026
Close:
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Provide construction services for PEP panel and System upgrades to aging PEP systems. Remove and replace the following components from the existing PEP system: Pump and discharge piping within the tank: All floats. All associated low-voltage and high-voltage wiring. Existing electrical panel. Interior tank splice box. Transport all removed components to the City Utility site for disposal (no off-site disposal allowed). Install and anchor a new City-supplied PEP electrical control panel on the exterior of the residence. Repair minor stucco damage when caused during panel removal or installation. Installation of PEP pump and Panel: Ensure panel installation meets electrical code requirements and City Utility standards. Confirm generator adapter compatibility and ensure unobstructed access for Utility personnel. Install the City-supplied pump and plumb discharge piping to match existing configuration within the tank. Install new floats and wiring as required. Run new double-insulated wiring through the existing ¾” conduit using fish tape. Connect all electrical components into the new panel and ensure proper labeling.
Available