Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of materials, tools, equipment, and labor for construction of Josephville Road Phase 1 improvements, including roadway, box culvert, and drainage, and the Josephville Road bridge over a tributary of Cuivre River in St. Charles County, Missouri.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project A road improvements: Removal of improvements, unclassified excavation, haul off excess material, type 5 aggregate for base (4" thick), gravel, bituminous pavement mixture pg64-22, (bp-1), bituminous pavement mixture pg64-22 (base), 6" bituminous base over compacted subgrade, tack coat, concrete pavement (6" non-reinforced), concrete pavement (7" non-reinforced), woven wire fence - 48", brick column metal fence, etc. Project B road bridge over tributary: Clearing and grubbing, removal of improvements, unclassified excavation, compacting embankment, shaping slopes class iii, type 5 aggregate for base (4" thick), gravel, bituminous pavement mixture, tack coat, mgs guardrail, mgs end anchor, type a crashworthy end terminal (mash), see attached files.
Posted Date
-
Due Date
Jan 7, 2026
Release: -
Close: Jan 7, 2026
Project A road improvements: Removal of improvements, unclassified excavation, haul off excess material, type 5 aggregate for base (4" thick), gravel, bituminous pavement mixture pg64-22, (bp-1), bituminous pavement mixture pg64-22 (base), 6" bituminous base over compacted subgrade, tack coat, concrete pavement (6" non-reinforced), concrete pavement (7" non-reinforced), woven wire fence - 48", brick column metal fence, etc. Project B road bridge over tributary: Clearing and grubbing, removal of improvements, unclassified excavation, compacting embankment, shaping slopes class iii, type 5 aggregate for base (4" thick), gravel, bituminous pavement mixture, tack coat, mgs guardrail, mgs end anchor, type a crashworthy end terminal (mash), see attached files.
AvailableWork include 1415 CY earth excavation; 1,280 LF sedimentation control; 70 LF sawing and sealing joints; 420 LF gutter line sealing for bridges; 29 LF 1-1/2" polyvinyl chloride plastic pipe; 265 SF 12" preformed expansion joint filler for bridges; 1,250 LF pre-augering of piles; 1110 CY special riprap; 220 LF 6" granite stone curbing; 391 LF 3 tube curb mounted bridge rail; 1150 SF sidewalk; 20 SF erosion control; 930 LF 4" yellow epoxy resin pavement marking. See outside link for more.
Posted Date
Nov 26, 2025
Due Date
Jan 21, 2026
Release: Nov 26, 2025
Close: Jan 21, 2026
Work include 1415 CY earth excavation; 1,280 LF sedimentation control; 70 LF sawing and sealing joints; 420 LF gutter line sealing for bridges; 29 LF 1-1/2" polyvinyl chloride plastic pipe; 265 SF 12" preformed expansion joint filler for bridges; 1,250 LF pre-augering of piles; 1110 CY special riprap; 220 LF 6" granite stone curbing; 391 LF 3 tube curb mounted bridge rail; 1150 SF sidewalk; 20 SF erosion control; 930 LF 4" yellow epoxy resin pavement marking. See outside link for more.
AvailableWork includes 228 LF of cofferdam and dewatering; 40 CY of compacted granular fill; 13 SF of 1/2" preformed expansion joint filler; 65 TN of hma; 333 LF of joint and crack sealing in bituminous concrete pavement; 64 LF of sawing and sealing joints; 532 SY of removal of existing wearing surfaces; 1 LS of removal of superstructure; 132 CY of bridge deck concrete (sip form); 320 LF of parapet concrete; 48 CY of approach slab concrete; 31 CY of intermediate riprap; 567 SY of membrane waterproofing (cols liquid elastomeric); etc, see attached file.
Posted Date
-
Due Date
Jan 21, 2026
Close: Jan 21, 2026
Work includes 228 LF of cofferdam and dewatering; 40 CY of compacted granular fill; 13 SF of 1/2" preformed expansion joint filler; 65 TN of hma; 333 LF of joint and crack sealing in bituminous concrete pavement; 64 LF of sawing and sealing joints; 532 SY of removal of existing wearing surfaces; 1 LS of removal of superstructure; 132 CY of bridge deck concrete (sip form); 320 LF of parapet concrete; 48 CY of approach slab concrete; 31 CY of intermediate riprap; 567 SY of membrane waterproofing (cols liquid elastomeric); etc, see attached file.
AvailableWork includes the Westside Road bridge replacement and approach roadway. Major work includes, but is not limited to: 1. Removal of the existing bridge in stages 2. Construction of a new bridge to be completed over two construction seasons 3. Road construction work 4. Sidewalks, curb and gutter 5. Traffic control and traffic handling 6. Utility coordination, relocations and installation 7. Storm water pollution control.
Posted Date
Nov 20, 2025
Due Date
Jan 22, 2026
Release: Nov 20, 2025
Close: Jan 22, 2026
Work includes the Westside Road bridge replacement and approach roadway. Major work includes, but is not limited to: 1. Removal of the existing bridge in stages 2. Construction of a new bridge to be completed over two construction seasons 3. Road construction work 4. Sidewalks, curb and gutter 5. Traffic control and traffic handling 6. Utility coordination, relocations and installation 7. Storm water pollution control.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis