Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx 740 CY excavation and embankment; 2,372 TN asphalt concrete; 6,622 LF cleaning and resealing existing long and transv. pavement joints;
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes approx 740 CY excavation and embankment; 2,372 TN asphalt concrete; 6,622 LF cleaning and resealing existing long and transv. pavement joints;
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Close: Dec 18, 2025
Work includes approx 740 CY excavation and embankment; 2,372 TN asphalt concrete; 6,622 LF cleaning and resealing existing long and transv. pavement joints;
AvailablePremium
Access the largest public sector contact database
Sealed-bid public works construction for sidewalk and associated curb, gutter, driveway approaches, curb ramps, catch basin reconstruction and related roadway excavation, concrete removal, grading, subgrade preparation, pavement transitions and utility box adjustments along Prescott Lane.
Posted Date
Nov 26, 2025
Due Date
Jan 8, 2026
Release: Nov 26, 2025
Close: Jan 8, 2026
Sealed-bid public works construction for sidewalk and associated curb, gutter, driveway approaches, curb ramps, catch basin reconstruction and related roadway excavation, concrete removal, grading, subgrade preparation, pavement transitions and utility box adjustments along Prescott Lane.
AvailableThe County of Fairfax requests Statements of Qualifications from qualified engineering firms for the Magnolia Lane Capacity Improvements Project, covering planning, design, permitting, and construction-phase support to upsize approximately 3,492 linear feet of existing 8-inch and 10-inch gravity sewer to new 12-inch and 16-inch pipes. The procurement is managed through the county's Wastewater Design and Construction Division and seeks firms to support the project from planning through construction-phase services.
Posted Date
Nov 17, 2025
Due Date
Jan 20, 2026
Release: Nov 17, 2025
Close: Jan 20, 2026
The County of Fairfax requests Statements of Qualifications from qualified engineering firms for the Magnolia Lane Capacity Improvements Project, covering planning, design, permitting, and construction-phase support to upsize approximately 3,492 linear feet of existing 8-inch and 10-inch gravity sewer to new 12-inch and 16-inch pipes. The procurement is managed through the county's Wastewater Design and Construction Division and seeks firms to support the project from planning through construction-phase services.
AvailableThe work consists of roadway excavation, demo and removal of existing concrete, grading and subgrade preparation for construction and/or reconstruction of concrete curb and gutter, sidewalks, driveway approaches and curb ramps, including pavement conform strips and driveway transition areas. Miscellaneous work includes reconstructing a catch basin, adjusting existing utility boxes to new finished grade and all other work.
Posted Date
Dec 6, 2025
Due Date
Jan 8, 2026
Release: Dec 6, 2025
Close: Jan 8, 2026
The work consists of roadway excavation, demo and removal of existing concrete, grading and subgrade preparation for construction and/or reconstruction of concrete curb and gutter, sidewalks, driveway approaches and curb ramps, including pavement conform strips and driveway transition areas. Miscellaneous work includes reconstructing a catch basin, adjusting existing utility boxes to new finished grade and all other work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis