Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work consists of roadway excavation, demo and removal of existing concrete, grading and subgrade preparation for construction and/or reconstruction of concrete curb and gutter, sidewalks, driveway approaches and curb ramps, including pavement conform strips and driveway transition areas. Miscellaneous work includes reconstructing a catch basin, adjusting existing utility boxes to new finished grade and all other work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Sealed-bid public works construction for sidewalk and associated curb, gutter, driveway approaches, curb ramps, catch basin reconstruction and related roadway excavation, concrete removal, grading, subgrade preparation, pavement transitions and utility box adjustments along Prescott Lane.
Posted Date
Nov 26, 2025
Due Date
Jan 8, 2026
Release: Nov 26, 2025
Close: Jan 8, 2026
Sealed-bid public works construction for sidewalk and associated curb, gutter, driveway approaches, curb ramps, catch basin reconstruction and related roadway excavation, concrete removal, grading, subgrade preparation, pavement transitions and utility box adjustments along Prescott Lane.
AvailableRelease: Nov 27, 2025
Close: Dec 12, 2025
Sidewalk improvements.
The County of Fairfax requests Statements of Qualifications from qualified engineering firms for the Magnolia Lane Capacity Improvements Project, covering planning, design, permitting, and construction-phase support to upsize approximately 3,492 linear feet of existing 8-inch and 10-inch gravity sewer to new 12-inch and 16-inch pipes. The procurement is managed through the county's Wastewater Design and Construction Division and seeks firms to support the project from planning through construction-phase services.
Posted Date
Nov 17, 2025
Due Date
Jan 20, 2026
Release: Nov 17, 2025
Close: Jan 20, 2026
The County of Fairfax requests Statements of Qualifications from qualified engineering firms for the Magnolia Lane Capacity Improvements Project, covering planning, design, permitting, and construction-phase support to upsize approximately 3,492 linear feet of existing 8-inch and 10-inch gravity sewer to new 12-inch and 16-inch pipes. The procurement is managed through the county's Wastewater Design and Construction Division and seeks firms to support the project from planning through construction-phase services.
This project consists of the reconstruction of approx. 800 LF of sidewalk, including curb and gutter, ramps, handrails, lighting improvements, and all associated appurtenances.
Posted Date
-
Due Date
Dec 19, 2025
Release: -
Close: Dec 19, 2025
This project consists of the reconstruction of approx. 800 LF of sidewalk, including curb and gutter, ramps, handrails, lighting improvements, and all associated appurtenances.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis