Summary
Work approx 4. 10 acres and serves the surrounding area through outdoor recreational opportunities including a baseball/softball field, playground, picnic areas and open space. The park is has a 1970's-era restroom/shelter structure. Project scope includes all labor, equipment, tools and materials, for the construction of a pre-engineered, prefabricated building and the demolition and removal of an existing 1970's park shelter including capping and moving utilities. The new building shall have an ada-accessible restroom to include all related items; plumbing, water and sewer, electrical and mechanical components. The project also includes installation of all hardscape and landscape features to include new ada walkway, benches, trash cans, picnic tables, east gude drive and taft street corner entryway, stormwater facilities as well as all trees, shrubs, and perennials.