AML- Bridgeport (Tomes) Landslide RFP
Work inlcudes landslide.
Description: Reclamation and construction work for the pen hollow landslide. The work to be performed under the terms of this specification consists of the stabilization of a landslide, construction of drainage controls, relocation of a section of water line, upgrade existing road to handle offroad trucks, safety measures installed on the road to prevent material being able to jump and revegetation where needed on the site.
StateAgency · VA, US
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from Virginia Department of Energy.
Adjacent opportunities open for bidding right now.
State AgencyWV
Posted
Sep 18, 2026
Nov 4, 2026
Work inlcudes landslide.
CountyOH
Posted
Oct 10, 2026
Oct 28, 2026
Work include 75' guardrail, type 5; 32' 15" conduit, type b; 3 CY rock channel protection, type c with filter; 1500 EA erosion control; 128 SY seeding and mulching, as per plan; 253' steel piles, misc. :soldier pile hp12x74; 193' drilled shafts, 30" diameter, as per plan; 65' plug piles, 36" diameter.
Utah Department of Transportation
State AgencyUT
Posted
Oct 3, 2026
Oct 27, 2026
Work consists of 162 CY of roadway excavation; 70 CY of abandon pipe; 390 ft of remove concrete curb and gutter; 110 CY of granular borrow; 314 ft of drainage pipe - 18", reinforced concrete, leak- resistant; 55 CY of untreated base course; 149 CY of asphalt pavement soft spot repair; 113 TON of HMA - 1/2"; 74 TON of emulsified asphalt; 5,188 TON of open graded surface course; 317 TON of asphalt binder; 490 SY of drill seed; 98,458 SY of rotomilling - 1"; 78,323 ft of grinding for grooved-in pavement markings; 1,198 ft of pavement message (preformed thermoplastic stop line, crosswalks - 12").
Polk County Conservation Board
CountyIA
Posted
Oct 6, 2026
Nov 20, 2026
This project consists of all materials, equipment, and labor necessary to complete the construction of the proposed fixed grip chairlift system. It is anticipated that the chairlift be completed prior to the 2027 winter operating season.