Posted
-
Oct 15, 2026
I-10 EB: Bridge Rail Repair at LM 8.150 RFP
Work includes bridge rail and deck repair, and soundwall anchor bolt installation. Includes 15 LF of concrete bridge railing repair and rehabilitation.
Description: Work includes removal and disposal of designated portions of existing bridge, excavation for shoulder paving 76.000 sta, liquid asphalt binder pg64-22 60.000 Ton, milling existing asphalt pavement 58,900.000 SY, asphalt base course type b 1,450.000 Ton, asphalt intermediate course type b 1,100.000 Ton, asphalt surface course type b 1,100.000 Ton, traffic control, barricade type iii 192.000 LF, permanent construction signs (ground mounted) 696.000 SF, permanent construction signs (barricade mounted) 288.000 SF, truck mounted attenuator 4.000 EA, portable terminal impact attenuator-test level 3 2.000 EA.
StateAgency · SC, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
Posted
-
Oct 15, 2026
Work includes bridge rail and deck repair, and soundwall anchor bolt installation. Includes 15 LF of concrete bridge railing repair and rehabilitation.
Massachusetts Department of Transportation
State AgencyMA
Posted
-
Oct 27, 2026
Project will consist of the reconstruction of the bridge joints (over the west abutments) and pier and related work.
CityMO
Posted
Sep 11, 2026
Oct 20, 2026
Proposed work includes the following: Replacement of bridge on 3rd Street.
CityNH
Posted
Sep 28, 2026
Oct 21, 2026
Replacing the existing 58' long, single-span bridge. The existing bridge consists of steel stringer superstructure with reinforced concrete deck supported on concrete faced stone masonry abutments. The work includes replacing the existing bridge with a 110' long steel girder bridge with concrete deck superstructure supported on semi-integral abutments. The replacement bridge will have an out-to-out deck width of 32' carrying two 12' wide travel lanes and a 5' sidewalk. Traffic will be maintained during construction on a temporary bridge constructed immediately downstream of the existing bridge. Roadway approach reconstruction limits are approx. 745'.
Decision makers connected to this RFP from South Carolina Department of Transportation.