Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of reconstruction & widening pf road, work includes 217,734 SY of separation geotextile; 72,578 CY of granular borrow; 2,283 SY of remove concrete pavement; 168,892 CY of roadway excavation; 63 CY of loose riprap; 48,214 CY of untreated base course; 3,090 SY of portland cement concrete pavement 13" thick; 111,478 TON of highly modified hot mix asphalt (hmhma); 73,341 SY of rotomilling - 9"; 21,616 SF of thin bonded polymer overlay, type i; 1,099 SF of concrete coating; 113,616 ft of 6" pavement marking tape - white; 2,347 ft of 6" pavement marking epoxy - white type 1. See attached files.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Georgia Department of Transportation seeks a General Engineering Consultant (GEC) to provide post-let services for the I-16 project from I-95/Chatham to SR 67/Bulloch, including project management, QA/contract compliance reviews, environmental support, and project controls. The consultant will serve as a technical extension of GDOT’s P3 Division and the Program Management Consultant, providing monthly status reports, change management support, and participation in project meetings. The work is for a multi-county highway project in Georgia and requires GDOT prequalification in relevant engineering area classes.
Posted Date
Dec 29, 2025
Due Date
Feb 3, 2026
Release: Dec 29, 2025
Close: Feb 3, 2026
The Georgia Department of Transportation seeks a General Engineering Consultant (GEC) to provide post-let services for the I-16 project from I-95/Chatham to SR 67/Bulloch, including project management, QA/contract compliance reviews, environmental support, and project controls. The consultant will serve as a technical extension of GDOT’s P3 Division and the Program Management Consultant, providing monthly status reports, change management support, and participation in project meetings. The work is for a multi-county highway project in Georgia and requires GDOT prequalification in relevant engineering area classes.
AvailableRFP for consultant services to prepare construction contract plans for the widening and reconstruction of Beaver Valley Road, including pavement expansion, curb and storm sewer installation, sight line improvements, and a new 10-foot-wide path.
Posted Date
Jan 20, 2026
Due Date
Feb 11, 2026
Release: Jan 20, 2026
Close: Feb 11, 2026
RFP for consultant services to prepare construction contract plans for the widening and reconstruction of Beaver Valley Road, including pavement expansion, curb and storm sewer installation, sight line improvements, and a new 10-foot-wide path.
AvailableProject consist of approx 10,507 LF of Grading; 44,136 SY of aggregate base course; 27,651 SY of 7" concrete pavement; 3,154 LF of 15" RCP Storm sewer; 20,500 LF of curb and gutter.
Posted Date
Jan 20, 2026
Due Date
Feb 10, 2026
Release: Jan 20, 2026
Close: Feb 10, 2026
Project consist of approx 10,507 LF of Grading; 44,136 SY of aggregate base course; 27,651 SY of 7" concrete pavement; 3,154 LF of 15" RCP Storm sewer; 20,500 LF of curb and gutter.
Available0.61 mi of Hot mix asphalt reconstruction and widening, bike lanes, drainage improvements, watermain, concrete curb and gutter, ramps, sidewalk, signing, and permanent pavement markings. Approx. 24 EA Tree, Rem, 19" to 36"; 33 STA Machine Grading, Modified; 250 CY Subgrade Undercutting, Type II, Modified; 87 EA Erosion Control, Inlet Protection, Fabric Drop; 12 EA Sewer Tap, 12 inch; 1 EA Sewer Tap, 30"; 831 LF Sewer, 12 inch, SDR-26; 1 ft Combined Sewer Manhole, Adj, Add Depth; 6,120 ft Underdrain, Subgrade, 6"; 21,090 SF Sidewalk, Conc, 4", Modified; 109 LF Water Main, 12", Tr Det G, Modified; 2 EA Connection to Existing 12" Water Main; 10 EA Hydrant, Complete, 6".
Posted Date
Jan 16, 2026
Due Date
Feb 6, 2026
Release: Jan 16, 2026
Close: Feb 6, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
0.61 mi of Hot mix asphalt reconstruction and widening, bike lanes, drainage improvements, watermain, concrete curb and gutter, ramps, sidewalk, signing, and permanent pavement markings. Approx. 24 EA Tree, Rem, 19" to 36"; 33 STA Machine Grading, Modified; 250 CY Subgrade Undercutting, Type II, Modified; 87 EA Erosion Control, Inlet Protection, Fabric Drop; 12 EA Sewer Tap, 12 inch; 1 EA Sewer Tap, 30"; 831 LF Sewer, 12 inch, SDR-26; 1 ft Combined Sewer Manhole, Adj, Add Depth; 6,120 ft Underdrain, Subgrade, 6"; 21,090 SF Sidewalk, Conc, 4", Modified; 109 LF Water Main, 12", Tr Det G, Modified; 2 EA Connection to Existing 12" Water Main; 10 EA Hydrant, Complete, 6".
Available