Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes Construct Irrigation Pump House on existing concrete slab.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consists of remove the current pool pump house and restroom building and replace it with a new ADA accessible building.
Posted Date
Jan 9, 2026
Due Date
Feb 9, 2026
Release: Jan 9, 2026
Close: Feb 9, 2026
Work consists of remove the current pool pump house and restroom building and replace it with a new ADA accessible building.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement of an irrigation pump station. Work include one 40hp pump, one 30hp pump, one 5hp auxiliary pump, one electrical control panel, one box framed skid for pump placement. Removal of the existing pumpstation includes: removing all current pumpstation pumps. Disconnecting the electrical control panel, removal of skylight, hauling the existing unit(s) away and proper disposal. Installation of the new pumpstation includes:lifting the pumps with a crane through the skylight, placing pumps in proper alignment with existing irrigation piping, installing new electrical control panel, connecting the existing piping to new pumps, connecting the electrical, installing skylight, start up and operational testing.
Posted Date
Jan 22, 2026
Due Date
Jan 31, 2026
Release: Jan 22, 2026
Close: Jan 31, 2026
Replacement of an irrigation pump station. Work include one 40hp pump, one 30hp pump, one 5hp auxiliary pump, one electrical control panel, one box framed skid for pump placement. Removal of the existing pumpstation includes: removing all current pumpstation pumps. Disconnecting the electrical control panel, removal of skylight, hauling the existing unit(s) away and proper disposal. Installation of the new pumpstation includes:lifting the pumps with a crane through the skylight, placing pumps in proper alignment with existing irrigation piping, installing new electrical control panel, connecting the existing piping to new pumps, connecting the electrical, installing skylight, start up and operational testing.
AvailableReplacement of pumps, booster pump control valves, steel piping, pipe supports, valves, painting and coating, wet well top slab, motor control center, supervisory control and data acquistion - remote terminal unit (SCADA-RTU), installation of a hydropneumatic tank and air compressor, and patching of metal siding, insulation and drywall.
Posted Date
Nov 26, 2025
Due Date
Jan 26, 2026
Release: Nov 26, 2025
Close: Jan 26, 2026
Replacement of pumps, booster pump control valves, steel piping, pipe supports, valves, painting and coating, wet well top slab, motor control center, supervisory control and data acquistion - remote terminal unit (SCADA-RTU), installation of a hydropneumatic tank and air compressor, and patching of metal siding, insulation and drywall.
The Project consists of the construction of a 2,236 SF wood framed building to house public library.
Posted Date
Jan 15, 2026
Due Date
Feb 5, 2026
Release: Jan 15, 2026
Close: Feb 5, 2026
The Project consists of the construction of a 2,236 SF wood framed building to house public library.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →