Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking contractors or joint ventures (JV) capable of pavement repairs including mill and overlay; striping, and any other elements related to pavement repairs. The work shall commence on or about April 1st, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Release: Jan 8, 2026
Close: Feb 10, 2026
Mill & Overlay Project
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Olathe is soliciting bids for the 2026 Local and Collector Street Mill and Overlay Project - Group B, which includes milling and resurfacing of thirty-seven local and collector asphalt streets, with approximately 122,000 square yards of full-width milling and 14,000 tons of new asphalt surface. The work also includes asphalt base repairs, replacement of pavement markings, installation of 140 ADA sidewalk ramps and 3 pedestrian refuge islands, 7,000 linear feet of sidewalk replacement and spot replacement of 23,000 linear feet of curb. This is an IFB-type procurement; questions are due Feb 5, 2026 and bids close Feb 12, 2026.
Posted Date
Jan 16, 2026
Due Date
Feb 12, 2026
Release: Jan 16, 2026
Close: Feb 12, 2026
The City of Olathe is soliciting bids for the 2026 Local and Collector Street Mill and Overlay Project - Group B, which includes milling and resurfacing of thirty-seven local and collector asphalt streets, with approximately 122,000 square yards of full-width milling and 14,000 tons of new asphalt surface. The work also includes asphalt base repairs, replacement of pavement markings, installation of 140 ADA sidewalk ramps and 3 pedestrian refuge islands, 7,000 linear feet of sidewalk replacement and spot replacement of 23,000 linear feet of curb. This is an IFB-type procurement; questions are due Feb 5, 2026 and bids close Feb 12, 2026.
AvailableWork includes mill down a depth of 2" to correct the profile for the entire pavement. The are that is marked out consists of roughly 19,597.1 SY of road surface that is 8,100 LF in length. The milled area will then be overlayed with a 2" county C-mix after application of proper tack and pavement marking restored. See outside link.
Posted Date
-
Due Date
Jan 27, 2026
Close: Jan 27, 2026
Work includes mill down a depth of 2" to correct the profile for the entire pavement. The are that is marked out consists of roughly 19,597.1 SY of road surface that is 8,100 LF in length. The milled area will then be overlayed with a 2" county C-mix after application of proper tack and pavement marking restored. See outside link.
AvailableStockade Drive mill and overlay.
Posted Date
Jan 10, 2026
Due Date
Jan 27, 2026
Release: Jan 10, 2026
Close: Jan 27, 2026
Stockade Drive mill and overlay.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →