CountyIN
Jul 10, 2026
Closes
Aug 13, 2026
C.R. 403 and Bethany Road Intersection Improvements, Traffic Signalization RFP
Intersection improvements and traffic signalization project.
Description: Project includes preparation of complete plans specifications, & estimates (ps&e) for intersection improvements, including traffic signal modifications necessary to implement protected left-turn operations. The consultant shall prepare all civil, signing and striping, traffic signal, utility coordination, and related construction documents necessary for bidding and construction of the proposed improvements. Tasks also include project management, existing site survey, and bid and construction support services. The consultant shall also comply with all applicable federal, state, local laws, ordinances, regulations, codes, and other regulatory procedures for the completion of the study.
City · CA, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CountyIN
Jul 10, 2026
Closes
Aug 13, 2026
Intersection improvements and traffic signalization project.
CountyVA
Jul 9, 2026
Closes
Aug 21, 2026
Provide construction engineering and inspection services for farmwell road intersection improvements.
CountyVA
Jul 7, 2026
Closes
Aug 18, 2026
Work includes 153 CY regular excavation; 138 CY borrow excavation; 164 LF under-drain ud-2; 603 LF under-drain ud-4; 32 LF outlet pipe; 223 LF 15" conc. Pipe; 1 EA drop inlet di-3b,l=6'; 1 EA drop inlet di-3b,l=8'; 2 EA ns drop inlet di-3b,l=8' top only; 1 EA drop inlet di-3b,l=10' top only; 752 LF ns pipe existing pipe & SI structure to be cleaned; 3 EA connect to exist. A/c pipe; 299 ton asphalt concrete ty. Sm-9. 5a const; 174 LF asphalt concrete ty.Bm-25.0a const; 2,001 SY flexible pavement planing 0"-2"; 1,426 LF saw-cut asphalt concrete. See attached file.
CountyFL
Jul 26, 2026
Closes
Aug 25, 2026
Work includes boulevard intersection improvements.
Procurement and program contacts connected to City of Hayward.