Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide streetscapes maintenance service includes turf: mow, fertilize, mechanical edge, chemical edge, aerate, re-seed, dethatch, irrigation system: check, adjust timing, ground cover: prune, fertilize, winter mow, shrubs: prune, fertilize, cultivate, debris: leaf pick-up, litter and other debris pick-up, trash receptacles, weed control: hand weeding, pre-emergent, post-emergent.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
BID SCHEDULE PHASE 2: Consists of constructing the prestressed concrete girder bridge, asphalt roadway and sidewalk connecting to existing Phase 1 of Park Ave (to the south) Park Ave southern waterline extension and concrete trail. All tree removal is included in Phase 2.
Posted Date
Dec 12, 2025
Due Date
Jan 9, 2026
Release: Dec 12, 2025
Close: Jan 9, 2026
BID SCHEDULE PHASE 2: Consists of constructing the prestressed concrete girder bridge, asphalt roadway and sidewalk connecting to existing Phase 1 of Park Ave (to the south) Park Ave southern waterline extension and concrete trail. All tree removal is included in Phase 2.
AvailableWork includes complete demolition of below listed structures; off-site disposal; backfilling; asbestos removal, if applicable; all utilities to be terminated and capped, as needed, pest control; site restoration and other ancillary items.
Posted Date
Dec 15, 2025
Due Date
Jan 8, 2026
Release: Dec 15, 2025
Close: Jan 8, 2026
Work includes complete demolition of below listed structures; off-site disposal; backfilling; asbestos removal, if applicable; all utilities to be terminated and capped, as needed, pest control; site restoration and other ancillary items.
AvailableRFP for the construction of Grant Avenue Street Maintenance.
Posted Date
Dec 17, 2025
Due Date
Jan 21, 2026
Release: Dec 17, 2025
Close: Jan 21, 2026
RFP for the construction of Grant Avenue Street Maintenance.
AvailableDive Services, Inspections, and Maintenance.
Posted Date
Nov 27, 2025
Due Date
Jan 9, 2026
Release: Nov 27, 2025
Close: Jan 9, 2026
Dive Services, Inspections, and Maintenance.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →