Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Maintenance of temporary security fencing, the demolition and removal of existing site features. The improvements will include, but are not limited to constructing a multi-use trail with landscaping for an 800- by 50-foot parkway. A 10-foot-wide asphalt concrete pathway consisting of decomposed granite trail shoulders, rockery wall, storm drain adjustment, bollards, rough and finish grading, temporary erosion control measures and stormwater bmps, new landscaping, vegetative swales, boulder installation, new irrigation system improvements, electrical system modifications, electrical conduit, and pedestrian lighting.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Release: Oct 23, 2025
Close: Jan 20, 2026
Parkway phase 1 - construction project.
AvailableHoward street generator replacement project. Bid Group #1, Bid Package #1 - Electrical.
Posted Date
Dec 17, 2025
Due Date
Jan 8, 2026
Release: Dec 17, 2025
Close: Jan 8, 2026
Howard street generator replacement project. Bid Group #1, Bid Package #1 - Electrical.
AvailableThis RFP is for the installation of approximately 690 LF of ductile iron water mains along Howard Boulevard, including fittings, service connections, components, and site restoration.
Posted Date
-
Due Date
Jan 6, 2026
Close: Jan 6, 2026
This RFP is for the installation of approximately 690 LF of ductile iron water mains along Howard Boulevard, including fittings, service connections, components, and site restoration.
AvailableProviding construction services for the sidewalk extension project. This project includes the installation of approx. 1,200 LF of 5' concrete sidewalk.
Posted Date
Dec 9, 2025
Due Date
Jan 5, 2026
Release: Dec 9, 2025
Close: Jan 5, 2026
Providing construction services for the sidewalk extension project. This project includes the installation of approx. 1,200 LF of 5' concrete sidewalk.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis