Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work consists of satisfactory removal and disposal of shoal material from within the channel limits as shown on the contract drawings, with disposal of dredged material into single point discharge locations delineated adjacent to the channel.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The work consists of satisfactory removal and disposal of shoal material from within the Houma Navigation Canal channel limits as shown on the contract drawings, with disposal of dredged material into single point discharge locations delineated adjacent to the channel.
Posted Date
Jan 24, 2024
Due Date
Feb 19, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work consists of satisfactory removal and disposal of shoal material from within the Houma Navigation Canal channel limits as shown on the contract drawings, with disposal of dredged material into single point discharge locations delineated adjacent to the channel.
AvailableThe work consists of the dredging and disposal of material from the Tiger Pass Ship Channel. Approx. 2.25 million CY of material will be dredged from the channel to restore navigation. The dredged material will be disposed of via pipeline into disposal sites specified in the Plans and Specifications. All disposal sites will be single point discharge. The work consists of the dredging and disposal of material from the Tiger Pass Ship Channel. Approx. 2.25 million CY of material will be dredged from the channel to restore navigation. The dredged material will be disposed of via pipeline into disposal sites specified in the Plans and Specifications. All disposal sites will be single point discharge.
Posted Date
Jul 16, 2025
Due Date
Jul 16, 2027
Release: Jul 16, 2025
Close: Jul 16, 2027
The work consists of the dredging and disposal of material from the Tiger Pass Ship Channel. Approx. 2.25 million CY of material will be dredged from the channel to restore navigation. The dredged material will be disposed of via pipeline into disposal sites specified in the Plans and Specifications. All disposal sites will be single point discharge. The work consists of the dredging and disposal of material from the Tiger Pass Ship Channel. Approx. 2.25 million CY of material will be dredged from the channel to restore navigation. The dredged material will be disposed of via pipeline into disposal sites specified in the Plans and Specifications. All disposal sites will be single point discharge.
AvailableFY26 GIWW Maintenance Dredging. Pipeline maintenance dredging and advanced maintenance dredging of the Bay. Schedule 1 will include GIWW maintenance dredging of approx. 1.5 million cubic yards (CY) of the Bay and will include varying advanced maintenance depths. Material will be placed across various placement areas located along the GIWW. This contract will be subject to several environmental windows, including bird nesting, turtle nesting, and piping plover.
Posted Date
Nov 10, 2025
Due Date
Aug 4, 2026
Release: Nov 10, 2025
Close: Aug 4, 2026
FY26 GIWW Maintenance Dredging. Pipeline maintenance dredging and advanced maintenance dredging of the Bay. Schedule 1 will include GIWW maintenance dredging of approx. 1.5 million cubic yards (CY) of the Bay and will include varying advanced maintenance depths. Material will be placed across various placement areas located along the GIWW. This contract will be subject to several environmental windows, including bird nesting, turtle nesting, and piping plover.
AvailableThe work consists of the removal and satisfactory disposal of dredged material excavated from the Tiger Pass Bar Channel and identification of utilities, within the limits shown on the contract drawings.
Posted Date
Feb 6, 2025
Due Date
Feb 5, 2027
Release: Feb 6, 2025
Close: Feb 5, 2027
The work consists of the removal and satisfactory disposal of dredged material excavated from the Tiger Pass Bar Channel and identification of utilities, within the limits shown on the contract drawings.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →