Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Florida School for the Deaf and the Blind
Work includes repair and remediation of the hospital creek bridge.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Union County
The project involves replacing an existing bridge about 300 FT east of the intersection. We understand that the new bridge will have a single 50-FT span and a width of 12½ FT. The superstructure will consist of steel beams with a cast-in-place reinforced concrete deck. 1 LS removal of existing structure, 35.2 SY sawcut and remove existing asphalt, 74 CY concrete bridge decking, erosion control.
Posted Date
Nov 12, 2025
Due Date
Dec 10, 2025
Release: Nov 12, 2025
Union County
Close: Dec 10, 2025
The project involves replacing an existing bridge about 300 FT east of the intersection. We understand that the new bridge will have a single 50-FT span and a width of 12½ FT. The superstructure will consist of steel beams with a cast-in-place reinforced concrete deck. 1 LS removal of existing structure, 35.2 SY sawcut and remove existing asphalt, 74 CY concrete bridge decking, erosion control.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
St Tammany Parish Development District
Emergency remediation services. Professional remediation contractor capable of performing remediation and restoration services for buildings and/or contents affected by water, wind, mold contamination, or other natural or manmade disasters.
Posted Date
Nov 4, 2025
Due Date
Dec 4, 2025
Release: Nov 4, 2025
St Tammany Parish Development District
Close: Dec 4, 2025
Emergency remediation services. Professional remediation contractor capable of performing remediation and restoration services for buildings and/or contents affected by water, wind, mold contamination, or other natural or manmade disasters.
AvailablePueblo of Santa Ana Police Department
Soliciting environmental remediation firms for contractual work completing the surface clearance of two formerly used WWII-era practice bombing range sites. The scope of work includes removal and safe disposal of munitions of explosive concern.
Posted Date
Oct 31, 2025
Due Date
Dec 1, 2025
Release: Oct 31, 2025
Pueblo of Santa Ana Police Department
Close: Dec 1, 2025
Soliciting environmental remediation firms for contractual work completing the surface clearance of two formerly used WWII-era practice bombing range sites. The scope of work includes removal and safe disposal of munitions of explosive concern.
AvailableNew Jersey Department of Transportation
DESIGN-BUILD: Project involves design-build services for the route 50 bridge over cedar swamp creek project.
Posted Date
Dec 2, 2024
Due Date
Jan 8, 2026
Release: Dec 2, 2024
New Jersey Department of Transportation
Close: Jan 8, 2026
DESIGN-BUILD: Project involves design-build services for the route 50 bridge over cedar swamp creek project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →