Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Hopewell Street Stormwater Upgrades Project consists of the installation of new stormwater mains, manhole, inlets, service lines, asphalt paving and restoration.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This project will disconnect existing storm drain outfalls from the piped portion of the No. 1 Canyon Drain (NOCD) system located in Pershing Street between Springwater Avenue and Maple Street and improve stormwater controls with a collective of replacement storm drainage systems and roadway infrastructure repairs. Work will include the installation of a combined 2,037 LF of 12", 18", and 24" corrugated polyethylene pipe (CPEP) connected by 24 pre-cast concrete catch basins of various sizes. The project includes 642 LF of gravel infiltration trenches of differing widths and sizes of perforated CPEP. Four (4) premanufactured water quality filtration catch basins will be installed off-line to treat surface runoff directly prior to release to the new drainage systems. The base project also includes approximately 1,433 LF of 8" ductile iron water main replacement is also included in the work for this project. The NOCD within the subject area is a combination of 36-inch diameter CPEP and 48" corrugated metal pipe (CMP). An alternative additive project scope of work has been identified and may be included in the final contract to remove and replace two (2) approximately 30 LF damaged portions of 36" CPEP and to install a new cured-in-place pipe (CIPP) liner over approximately 1,066 LF of the existing 48" CMP portion of the NOCD.
Posted Date
Jan 6, 2026
Due Date
Jan 28, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Release: Jan 6, 2026
Close: Jan 28, 2026
This project will disconnect existing storm drain outfalls from the piped portion of the No. 1 Canyon Drain (NOCD) system located in Pershing Street between Springwater Avenue and Maple Street and improve stormwater controls with a collective of replacement storm drainage systems and roadway infrastructure repairs. Work will include the installation of a combined 2,037 LF of 12", 18", and 24" corrugated polyethylene pipe (CPEP) connected by 24 pre-cast concrete catch basins of various sizes. The project includes 642 LF of gravel infiltration trenches of differing widths and sizes of perforated CPEP. Four (4) premanufactured water quality filtration catch basins will be installed off-line to treat surface runoff directly prior to release to the new drainage systems. The base project also includes approximately 1,433 LF of 8" ductile iron water main replacement is also included in the work for this project. The NOCD within the subject area is a combination of 36-inch diameter CPEP and 48" corrugated metal pipe (CMP). An alternative additive project scope of work has been identified and may be included in the final contract to remove and replace two (2) approximately 30 LF damaged portions of 36" CPEP and to install a new cured-in-place pipe (CIPP) liner over approximately 1,066 LF of the existing 48" CMP portion of the NOCD.
AvailableConduct a feasibility analysis for building offsite stormwater capture in the public right of way.
Posted Date
Nov 10, 2025
Due Date
Jan 26, 2026
Release: Nov 10, 2025
Close: Jan 26, 2026
Conduct a feasibility analysis for building offsite stormwater capture in the public right of way.
AvailableStormwater and multi-use pathway project.
Posted Date
Jan 7, 2026
Due Date
Feb 10, 2026
Release: Jan 7, 2026
Close: Feb 10, 2026
Stormwater and multi-use pathway project.
AvailableProcurement of CCTV upgrades and additions for the Blount Street Parking Deck.
Posted Date
Dec 19, 2025
Due Date
Jan 22, 2026
Release: Dec 19, 2025
Close: Jan 22, 2026
Procurement of CCTV upgrades and additions for the Blount Street Parking Deck.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →