Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Port of New Orleans
Work consists of furnishing all labor, material, and equipment for the demolition and removal of existing buildings, foundations, slabs, roads, fencing, towers, poles, surface-level utility infrastructure, outdoor electrical equipment, miscellaneous surface and subsurface obstructions, as well as the site-wide management of hazardous materials, including the pre-demolition abatement of asbestos in buildings 1,2, and 5, osha-compliant handling of lead-based paint on exterior surfaces of buildings 1 and 4, and the proper recycling or disposal of universal wastes located throughout all buildings, including the south guard shack
Posted Date
Jul 20, 2026
Due Date
Aug 14, 2026
Release: Jul 20, 2026
Port of New Orleans
Close: Aug 14, 2026
Work consists of furnishing all labor, material, and equipment for the demolition and removal of existing buildings, foundations, slabs, roads, fencing, towers, poles, surface-level utility infrastructure, outdoor electrical equipment, miscellaneous surface and subsurface obstructions, as well as the site-wide management of hazardous materials, including the pre-demolition abatement of asbestos in buildings 1,2, and 5, osha-compliant handling of lead-based paint on exterior surfaces of buildings 1 and 4, and the proper recycling or disposal of universal wastes located throughout all buildings, including the south guard shack
AvailablePort of New Orleans
Provide as needed purchase and delivery of aggregate materials.
Posted Date
Jul 21, 2026
Due Date
Aug 5, 2026
Release: Jul 21, 2026
Port of New Orleans
Close: Aug 5, 2026
Provide as needed purchase and delivery of aggregate materials.
AvailablePort of New Orleans
Work consists of furnishing all labor, material and equipment for demolition and repair of structures.
Posted Date
Jun 15, 2026
Due Date
Jul 13, 2026
Release: Jun 15, 2026
Port of New Orleans
Close: Jul 13, 2026
Work consists of furnishing all labor, material and equipment for demolition and repair of structures.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge