Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes, exterior: abrasive blast clean to a sspc-sp6 commercial standard with containment. Apply a four (4) coat zinc epoxy urethane fluoropolymer system. Wet interior: abrasive blast clean to a sspc-sp10 near-white metal standard. Apply a three (3) coat zinc epoxy system. Apply a polyurethane caulk to the roof lap seams. Dry interior: abrasive blast clean the entire tops of the platforms (including 1 ft. Up the riser wall) and spot coating failures throughout to a sspc-sp6 commercial standard. Apply a spot two (2) coat epoxy system to the rest of the prepared surfaces. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work consists of the interior and exterior painting and tank repair work of the 1,000,000 gallon elevated water tank.
Posted Date
Dec 23, 2025
Due Date
Jan 22, 2026
Release: Dec 23, 2025
Close: Jan 22, 2026
Work consists of the interior and exterior painting and tank repair work of the 1,000,000 gallon elevated water tank.
Available2026 water tank sandblasting and painting-arrowhead 1,000,000 gallon ground tank.
Posted Date
Dec 20, 2025
Due Date
Jan 29, 2026
Release: Dec 20, 2025
Close: Jan 29, 2026
2026 water tank sandblasting and painting-arrowhead 1,000,000 gallon ground tank.
AvailableSupply a water tank.
Posted Date
Jan 2, 2026
Due Date
Jan 23, 2026
Release: Jan 2, 2026
Close: Jan 23, 2026
Supply a water tank.
AvailableThe City of Cotter, Arkansas is soliciting proposals for painting and rehabilitation of two water storage tanks (a 90x30 welded steel standpipe and a 12x44' riveted ground storage tank). Firms must provide a price for rehabilitation of each tank and submit sealed proposals with a 5% bid bond; proposals must be mailed or delivered to Cotter City Hall. The City reserves the right to waive formalities and reject any or all proposals; the RFP/specifications are available from the Cotter Mayor (mayor@cotterar.gov) or at City Hall.
Posted Date
Dec 7, 2025
Due Date
Jan 27, 2026
Release: Dec 7, 2025
Close: Jan 27, 2026
The City of Cotter, Arkansas is soliciting proposals for painting and rehabilitation of two water storage tanks (a 90x30 welded steel standpipe and a 12x44' riveted ground storage tank). Firms must provide a price for rehabilitation of each tank and submit sealed proposals with a 5% bid bond; proposals must be mailed or delivered to Cotter City Hall. The City reserves the right to waive formalities and reject any or all proposals; the RFP/specifications are available from the Cotter Mayor (mayor@cotterar.gov) or at City Hall.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis