Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The U.S. Army Corps of Engineers (listed under the U.S. Department of Defense) is soliciting quotes to remove and replace two mooring clusters at Holden Beach, NC, including disposal off-site and installation of two new steel mooring pipes with fender systems. The project is a small-business set-aside, estimated between $100,000 and $250,000, and requires relevant contractor experience and appropriate North Carolina licensing. The contract will be awarded to the lowest-priced, technically acceptable offer and requires submission of a technical proposal and a quote including labor, materials, and equipment.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Requirements: Remove and dispose of off-site the (2) existing mooring clusters. Disposal of materials shall follow state and local solid waste disposal regulations. Provide and Install (2) 30” Diameter x .750” Wall x 40’ steel pilings. Steel pilings shall be capped off with a welded plate cover. Top 30’ Coated with 16 mil Coal Tar Epoxy. Provide and Install (2) 24” Cleats per piling on top of the Fender crown collar. See attached file.
Posted Date
Jan 6, 2026
Due Date
Jan 26, 2026
Release: Jan 6, 2026
Close: Jan 26, 2026
Requirements: Remove and dispose of off-site the (2) existing mooring clusters. Disposal of materials shall follow state and local solid waste disposal regulations. Provide and Install (2) 30” Diameter x .750” Wall x 40’ steel pilings. Steel pilings shall be capped off with a welded plate cover. Top 30’ Coated with 16 mil Coal Tar Epoxy. Provide and Install (2) 24” Cleats per piling on top of the Fender crown collar. See attached file.
Removal and replacement of curbs and gutters on an as needed basis.
Posted Date
Jan 22, 2026
Due Date
Feb 20, 2026
Release: Jan 22, 2026
Close: Feb 20, 2026
Removal and replacement of curbs and gutters on an as needed basis.
AvailableProvide mooring line. Synthetic 12-Strand Rope Assemblies.
Posted Date
Jan 20, 2026
Due Date
Jan 27, 2026
Release: Jan 20, 2026
Close: Jan 27, 2026
Provide mooring line. Synthetic 12-Strand Rope Assemblies.
AvailableRemoval and replacement of existing emergency generator.
Posted Date
Oct 6, 2025
Due Date
Feb 26, 2026
Release: Oct 6, 2025
Close: Feb 26, 2026
Removal and replacement of existing emergency generator.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis