Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
IDOT is soliciting bids for HMA resurfacing of Maple Avenue in the Village of Brookfield (Cook County), from Brookfield Avenue to 31st Street. Work includes pavement patching, curb and gutter replacement, sidewalk and driveway apron replacement, ADA ramps, curb bump-outs, and installation of flashing beacons at a school crossing. The contract is scheduled for the January 16, 2026 letting and specifies 80 working days to complete the project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
1.00 mi of Hot mix asphalt resurfacing and widening, concrete curb, gutter, sidewalk and ramps and pavement markings. Approx. 34 CY Subgrade Undercutting, 1 by 3, Modified; 112 EA Erosion Control, Silt Sack, Modified; 3,532 SY Aggregate Base, 4 inch, Modified; 250 LF Video Taping Sewer and Culv Pipe; 50 LF Sewer, PVC, 10 inch, Tr Det B, Modified; 15,443 SY Cold Milling HMA Surface; 293 ft Curb and Gutter, Conc, Det B1, Modified; 418 LF Water Main, DI, 12", OC; 2,187 LF Water Main, HDD, HDPE, 12". See attached file.
Posted Date
Jan 16, 2026
Due Date
Feb 6, 2026
Release: Jan 16, 2026
Close: Feb 6, 2026
1.00 mi of Hot mix asphalt resurfacing and widening, concrete curb, gutter, sidewalk and ramps and pavement markings. Approx. 34 CY Subgrade Undercutting, 1 by 3, Modified; 112 EA Erosion Control, Silt Sack, Modified; 3,532 SY Aggregate Base, 4 inch, Modified; 250 LF Video Taping Sewer and Culv Pipe; 50 LF Sewer, PVC, 10 inch, Tr Det B, Modified; 15,443 SY Cold Milling HMA Surface; 293 ft Curb and Gutter, Conc, Det B1, Modified; 418 LF Water Main, DI, 12", OC; 2,187 LF Water Main, HDD, HDPE, 12". See attached file.
Available0.19 mi of hot mix asphalt reconstruction, concrete curb, gutter and sidewalk ramps, storm sewer work and pavement markings.
Posted Date
Jan 9, 2026
Due Date
Feb 6, 2026
Release: Jan 9, 2026
Close: Feb 6, 2026
0.19 mi of hot mix asphalt reconstruction, concrete curb, gutter and sidewalk ramps, storm sewer work and pavement markings.
Available0.36 mi of hot mix asphalt cold milling and resurfacing, concrete curb, sidewalk and ramps, signing and pavement markings.
Posted Date
Jan 9, 2026
Due Date
Feb 6, 2026
Release: Jan 9, 2026
Close: Feb 6, 2026
0.36 mi of hot mix asphalt cold milling and resurfacing, concrete curb, sidewalk and ramps, signing and pavement markings.
AvailableFurnishing all the labor, materials, equipment, and doing all the work necessary for the construction and completion of approximately 35,600 LF curb & gutter replacement; 86,770 SF sidewalk, curb ramp and driveway approach replacement; 916 SF new sidewalk construction, 555 SY full depth concrete street pavement patching and grass terrace restoration.
Posted Date
Jan 7, 2026
Due Date
Jan 28, 2026
Release: Jan 7, 2026
Close: Jan 28, 2026
Furnishing all the labor, materials, equipment, and doing all the work necessary for the construction and completion of approximately 35,600 LF curb & gutter replacement; 86,770 SF sidewalk, curb ramp and driveway approach replacement; 916 SF new sidewalk construction, 555 SY full depth concrete street pavement patching and grass terrace restoration.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis