Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 8 SY class C patches, type I, 11"; 63 SY class C patches, type II, 11"; 798 ton hot-mix asphalt surface course, IL-9. 5, mix "C", N70; 74 ton incidental hot-mix asphalt surfacing; 96 SY class C patches, type IV, 11"; 64 ton aggregate wedge shoulder, type b; 905' short term pavement marking; 8,964' temporary pavement marking - line 4"- paint; 126' temporary pavement marking - line 24"- paint; 126' temporary pavement marking - line 24"- paint; 317' detector loop, type I; 9,431 SY area reflective crack control treatment.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Saline County is soliciting competitive bids for 2026 hot-mix asphalt pavement work, milling, and aggregate shoulder construction. The project scope includes HMA pavement placement, milling operations, and aggregate shouldering per the bid specifications; completion is expected in 2026. Bids are due December 30, 2025, with an 11:00 AM Central bid opening; the solicitation is an Invitation for Bid and not a grant.
Posted Date
Nov 26, 2025
Due Date
Dec 30, 2025
Release: Nov 26, 2025
Close: Dec 30, 2025
Saline County is soliciting competitive bids for 2026 hot-mix asphalt pavement work, milling, and aggregate shoulder construction. The project scope includes HMA pavement placement, milling operations, and aggregate shouldering per the bid specifications; completion is expected in 2026. Bids are due December 30, 2025, with an 11:00 AM Central bid opening; the solicitation is an Invitation for Bid and not a grant.
AvailableWork includes 48,416' longitudinal joint sealant; 2,649 SY hot-mix asphalt surface removal - butt joint; 1,192 pound bituminous materials (tack coat); 131,395 SY hot-mix asphalt surface removal, 1 1/2"; 2,528 ton aggregate wedge shoulder, type B; 273 SY hot-mix asphalt shoulders, 6 1/2"; 78 CY class SI concrete (outlet); 6,748' concrete gutter, type A; 480 cal da. Changeable message sign; 79' preformed plastic pavement marking, type d - standard - line 24"; 144,515' modified urethane pavement marking - line 5"; 6 EA. Rumble strip.
Posted Date
-
Due Date
Jan 16, 2026
Close: Jan 16, 2026
Work includes 48,416' longitudinal joint sealant; 2,649 SY hot-mix asphalt surface removal - butt joint; 1,192 pound bituminous materials (tack coat); 131,395 SY hot-mix asphalt surface removal, 1 1/2"; 2,528 ton aggregate wedge shoulder, type B; 273 SY hot-mix asphalt shoulders, 6 1/2"; 78 CY class SI concrete (outlet); 6,748' concrete gutter, type A; 480 cal da. Changeable message sign; 79' preformed plastic pavement marking, type d - standard - line 24"; 144,515' modified urethane pavement marking - line 5"; 6 EA. Rumble strip.
HMA Overlay.
Posted Date
Dec 15, 2025
Due Date
Jan 21, 2026
Release: Dec 15, 2025
Close: Jan 21, 2026
HMA Overlay.
AvailableWork includes 1,034 SY topsoil furnish and place, 4"; 11,236' longitudinal joint sealant; 728 SY hot-mix asphalt surface removal - butt joint; 53,633 SY hot-mix asphalt surface removal, 3 3/4"; 3 sywelded wire reinforcement; 1,073 SY class D patches, type II, 12"; 135 SY class d patches, type I, 12"; 671 SY class D patches, type IV, 12"; 10,209 sf concrete median surface, 4"; 14,453' shoulder rumble strips, 16"; 22,434' temporary pavement marking - line 4"- paint; 329' temporary pavement marking - line 24"- paint.
Posted Date
-
Due Date
Jan 16, 2026
Release: -
Close: Jan 16, 2026
Work includes 1,034 SY topsoil furnish and place, 4"; 11,236' longitudinal joint sealant; 728 SY hot-mix asphalt surface removal - butt joint; 53,633 SY hot-mix asphalt surface removal, 3 3/4"; 3 sywelded wire reinforcement; 1,073 SY class D patches, type II, 12"; 135 SY class d patches, type I, 12"; 671 SY class D patches, type IV, 12"; 10,209 sf concrete median surface, 4"; 14,453' shoulder rumble strips, 16"; 22,434' temporary pavement marking - line 4"- paint; 329' temporary pavement marking - line 24"- paint.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →