Retrieving RFP details
Release
Close
Illinois Department of Transportation
Work includes 1,034 SY topsoil furnish and place, 4"; 11,236' longitudinal joint sealant; 728 SY hot-mix asphalt surface removal - butt joint; 53,633 SY hot-mix asphalt surface removal, 3 3/4"; 3 sywelded wire reinforcement; 1,073 SY class D patches, type II, 12"; 135 SY class d patches, type I, 12"; 671 SY class D patches, type IV, 12"; 10,209 sf concrete median surface, 4"; 14,453' shoulder rumble strips, 16"; 22,434' temporary pavement marking - line 4"- paint; 329' temporary pavement marking - line 24"- paint.
Iowa Department of Transportation
1,291.34 CY excavation, cl 13; 150 LF guardrail, formed steel beam; 16,700 Ton hot mix asphalt; 605.40 station pavement markings; 57,984.60 SY pavement scarification; 900 Ton surfacing, crushed stone. See attached file.
Illinois Department of Transportation
Work includes 57,162 SY cape seal; 73 SY hot-mix asphalt surface removal - butt joint; 1 LS traffic control and protection, standard 701306; 15 CAL. Da. Changeable message sign; 2,338' short term pavement marking; 779 SF short term pavement marking removal; 53,465' modified urethane pavement marking - line 5"; 294 EA. Raised reflective pavement marker; 40,689 pound bituminous materials (fog seal).
Illinois Department of Transportation
Work includes 48,416' longitudinal joint sealant; 2,649 SY hot-mix asphalt surface removal - butt joint; 1,192 pound bituminous materials (tack coat); 131,395 SY hot-mix asphalt surface removal, 1 1/2"; 2,528 ton aggregate wedge shoulder, type B; 273 SY hot-mix asphalt shoulders, 6 1/2"; 78 CY class SI concrete (outlet); 6,748' concrete gutter, type A; 480 cal da. Changeable message sign; 79' preformed plastic pavement marking, type d - standard - line 24"; 144,515' modified urethane pavement marking - line 5"; 6 EA. Rumble strip.
Release
-
Close
Nov 07, 2025