Work consists of HMA overlay, preventive maintenance, includes 641 SY of sidewalk concrete, remove; 30 TON of HMA patching, full depth, type c; 357 TON of HMA patching, partial depth, type c; 55,870 SY of milling, asphalt, 2"; 48,125 LF of void reducing asphalt membrane for HMA; 148 LF of guardrail, remove; 378 SY of sidewalk, concrete; 23,380 LF of temporary pavement marking, removable, 6"; 1,030 LF of temporary traffic barrier, type 2; 120 SF of sign, sheet, with legend, 0.080" thickness; 30,840 LF of signal cable, roadway loop, copper, 1c/14 gauge; 16,435 LF of signal cable, detector lead-in, copper, 2c/16 gauge; 23877 LF of grooving for pavement markings; 4,070 LF of line, preformed plastic, solid, white, 6"; 6,265 LF of line, preformed plastic, broken, white, 6"; 1,257 LF of transverse marking, thermoplastic, crosshatch line, yellow, 12". See outside link & attached file.
Available