Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Little Elm
Paving improvements. Approx 12,820 SY of 8” continuously reinforced concrete pavement; 3,675 LF of storm drain, traffic signal improvements, and landscape amenities.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Ouachita Parish
Lane improvements.
Posted Date
Nov 6, 2025
Due Date
Dec 4, 2025
Release: Nov 6, 2025
Ouachita Parish
Close: Dec 4, 2025
Lane improvements.
AvailableCity of Pigeon Forge
The City of Pigeon Forge, Tennessee is seeking bids for roadway improvements on Dollywood Lane (SR-449), including grading, drainage, base stone placement, asphalt paving, curb and gutter, sidewalk, pavement marking, and traffic signal modification.
Posted Date
-
Due Date
Dec 3, 2025
City of Pigeon Forge
Close: Dec 3, 2025
The City of Pigeon Forge, Tennessee is seeking bids for roadway improvements on Dollywood Lane (SR-449), including grading, drainage, base stone placement, asphalt paving, curb and gutter, sidewalk, pavement marking, and traffic signal modification.
AvailableLander County
Work consists of installing approx 1,360 LF of 8" pvc water main and approximately 260 LF of 6" pvc water main at a depth of approx 42" below existing ground surface; installing in-line gate valves and new fire hydrants, and water services; tying into an existing 16" water main on yellow brick road; installing approx 500 LF of 12" pvc gravity sewer main on yellow brick road west of the existing westernmost sewer manhole; installing sewer manholes and sewer laterals.
Posted Date
Nov 5, 2025
Due Date
Nov 18, 2025
Release: Nov 5, 2025
Lander County
Close: Nov 18, 2025
Work consists of installing approx 1,360 LF of 8" pvc water main and approximately 260 LF of 6" pvc water main at a depth of approx 42" below existing ground surface; installing in-line gate valves and new fire hydrants, and water services; tying into an existing 16" water main on yellow brick road; installing approx 500 LF of 12" pvc gravity sewer main on yellow brick road west of the existing westernmost sewer manhole; installing sewer manholes and sewer laterals.
Borough of Bay Head
Removal and disposal of 144 LF +/- existing storm drainage pipe and storm drainage manholes, installation of 144 LF of 12" DIP class 52 with storm sewer manholes, installation of wapro inline check valve, unclassified excavation, permanent pavement restoration, site restoration and all related work.
Posted Date
Nov 12, 2025
Due Date
Nov 25, 2025
Release: Nov 12, 2025
Borough of Bay Head
Close: Nov 25, 2025
Removal and disposal of 144 LF +/- existing storm drainage pipe and storm drainage manholes, installation of 144 LF of 12" DIP class 52 with storm sewer manholes, installation of wapro inline check valve, unclassified excavation, permanent pavement restoration, site restoration and all related work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis