Retrieving RFP details
Release
Close
City of Eagle Point
Construction of highway 62 pump station upgrades. Work to be performed includes pump station retrofit, miscellaneous site work, and flow control valve installation.
Town of Westborough
Project includes pump and channel grinder replacement, wet well access modifications and improvements, generator replacement (Maynard Pump Station only), window replacement, installation of new bathroom(s) and associated electrical and instrumentation rehabilitation; and all materials, equipment, services and construction inherent to the Work.
City of Miami Beach
Storm Water Pump Station 24 Water Quality Upgrades.
Derry Township Municipal (Sewer) Authority
Project generally consists of, but is not limited to: construction of a new submersible style pump station with wet well, valve vault, control building, emergency generator platform, site piping and improvements, and related electrical work to replace the existing High Meadows Pump Station, and demolition of the existing pump station. The Project also includes the construction of approximately 3,600 feet of 16" HDPE force main, 90 feet of 12" PVC force min, 172 feet of 15" gravity sewer main and associated manholes and appurtenances.
Release
Oct 10, 2025
Close
Nov 12, 2025