Higher EducationTX
Posted
Aug 12, 2026
Oct 26, 2026
WWTP Improvements Project- Phase 1 - Request for Proposal
Provide wwtp improvements project- phase 1.
Description: Work includes 40 LF furnish & install, hdpe, 18" w/ appurtenances; 20 LF furnish & install, hdpe, 30" w/ appurtenances; 1 EA furnish & install, fdot j-48"x48" manhole; 2 EA furnish & install, insertable, check valve,18" ; 1 EA furnish & install, insert-able, check valve,30"; 3 EA furnish & install, sst cps & accessories ; 30 da storm sewer by-pass; 40 LF utility pipe to be grout filled & abandoned; 580 LF furnish & install 12" type b stabilized subgrade ; 50 SY furnish & install 8" limerock base ; 700 SY furnish and install 1" type sp 9.5 pavement; 20 SY furnish & install, gravel driveway.
City · FL, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
Higher EducationTX
Posted
Aug 12, 2026
Oct 26, 2026
Provide wwtp improvements project- phase 1.
CityIN
Posted
Sep 23, 2026
Oct 12, 2026
The project includes but is not limited to improvements to the existing Cook-Crumley Park and addition of new amenities for resident use. New additions to the park include an asphalt parking area, asphalt walking path, and a new basketball court. Existing infrastructure will be improved through renovation of the existing basketball court into a new pre-engineered pavilion area, site grading for future improvements projects. The site borders Grant Creek but all improvements will be outside of the Grant Creek floodway.
CityIA
Posted
Sep 15, 2026
Oct 29, 2026
Planned improvements shall include preliminary treatment building upgrades (mechanical screen replacement, grit equipment replacement, and HVAC improvements), primary clarifiers replacement, new primary sludge pumping station, new intermediate lift station, aeration tank rehabilitation and process improvements (conversion to three-stage), aeration blower replacement in a new secondary control building, replacement of existing final clarifier 1-4 mechanisms and structural rehabilitation and handrail replacement, new final clarifier construction, ras pump station replacement in a new secondary control building, rehab of one anaerobic digester for conversion to sludge storage, plant wide odor control to address odors from the headworks, primary clarifiers, intermediate lift station, and solids dewatering areas, new plantwide standby emergency power generator(s), new WWTP main switchgear replacement, new WWTP SCADA system upgrades, code related improvements for NFPA 820 and other safety related standards, demolition of unused WWTP structures and buildings (north primary clarifiers and associated pump houses, south primary clarifiers and associated pump houses, south headworks building and grit detritor system, gas conditioning building, pipe valve vault building, garage #1, garage #2, and storage building adjacent to the chlorine contact tanks) and related HVAC, plumbing, electrical, instrumentation, and site/civil improvements.
CityIL
Posted
Sep 29, 2026
Oct 13, 2026
The work consists of, in general, pavement removal, underground utility removals, site clearing, storm sewer installations, mass grading, aggregate base course, native plantings and tree installations, landscape restoration, and other associated improvements, including specific quantities such as 32.0 units of tree removal (6 to 15 inches diameter), 7.0 units of tree removal (over 15 inches diameter), 2,603.0 feet of temporary fence, 25,000.0 cubic yards of earth excavation, 26,630.0 square yards of topsoil (furnish and place, 4 inches), 2,220.0 square yards of aggregate base course (type B 8 inches), 7,240.0 square yards of pavement removal, 51.0 feet of storm sewers (class b, type 1, 18 inches), and 137.0 feet of storm sewers (class b, type 1, 24 inches).
Decision makers connected to this RFP from City of North Miami Beach.