Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide design services for the Highland Ranch Parkway Capacity Project. The focus of this project seeks to increase safety, add roadway capacity, and improve multimodal facilities.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Release: Oct 23, 2025
Close: Feb 3, 2026
Parkway phase 1 - construction project.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
San Diego State University (Contract and Procurement Management) issued an RFQ soliciting quotes from subcontractors and suppliers for multiple scopes of work on the Fenton Parkway Bridge Project; the solicitation includes a 6% DVBE participation goal. Responses are due Feb 4, 2026 at 2:00 PM PST (electronic submission) and quotes must remain valid through Oct 1, 2026; the project is currently in the bidding stage and has no pre-bid meeting. The RFQ was posted on the buyer’s PlanetBids portal and identifies Flatiron Dragados Constructors, Inc. as the prime contractor coordinating subcontractor engagement.
Posted Date
Jan 15, 2026
Due Date
Feb 4, 2026
Release: Jan 15, 2026
Close: Feb 4, 2026
San Diego State University (Contract and Procurement Management) issued an RFQ soliciting quotes from subcontractors and suppliers for multiple scopes of work on the Fenton Parkway Bridge Project; the solicitation includes a 6% DVBE participation goal. Responses are due Feb 4, 2026 at 2:00 PM PST (electronic submission) and quotes must remain valid through Oct 1, 2026; the project is currently in the bidding stage and has no pre-bid meeting. The RFQ was posted on the buyer’s PlanetBids portal and identifies Flatiron Dragados Constructors, Inc. as the prime contractor coordinating subcontractor engagement.
AvailableThis project includes but is not limited to traffic control, erosion and sediment control, clearing and grading, roadway installation, concrete curb and gutters and sidewalks, stormwater improvements, installation of traffic medians with landscaping, coordination of as well as installation and modification of utilities, traffic striping, traffic signal modifications, and signage within the project limits.
Posted Date
Jan 6, 2026
Due Date
Feb 9, 2026
Release: Jan 6, 2026
Close: Feb 9, 2026
This project includes but is not limited to traffic control, erosion and sediment control, clearing and grading, roadway installation, concrete curb and gutters and sidewalks, stormwater improvements, installation of traffic medians with landscaping, coordination of as well as installation and modification of utilities, traffic striping, traffic signal modifications, and signage within the project limits.
AvailableWork includes 8,531 LF of 16" water line by open cut and 4,456 LF of 30" water line by open cut. Also includes 4,416 LF of 16" PVC C905 water pipe; 3,167 LF of 16" PVC C905 water pipe (restrained joints); 530 LF of 16" water carrier pipe (DI with casing spacers); 3,524 LF of 30" DIP water pipe; see attached files.
Posted Date
Jan 14, 2026
Due Date
Feb 5, 2026
Release: Jan 14, 2026
Close: Feb 5, 2026
Work includes 8,531 LF of 16" water line by open cut and 4,456 LF of 30" water line by open cut. Also includes 4,416 LF of 16" PVC C905 water pipe; 3,167 LF of 16" PVC C905 water pipe (restrained joints); 530 LF of 16" water carrier pipe (DI with casing spacers); 3,524 LF of 30" DIP water pipe; see attached files.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →