CitySC
Aug 11, 2026
Closes
Sep 10, 2026
High- and Low-Level Meter Pit Upgrades
Project consists of but is not limited to the following: installation of temporary and permanent bypass piping for the high-level and low-level metering pits including piping and appurtenances; demolition and replacement of existing meter pit piping, couplings, gate valves, butterfly valves, air release valves, sampling lines, control wiring and conduit, and concrete valve vault tops; relocation of the flow transmitters; demolition and replacement of the high-level and low-level surge relief valves including piping, valves, couplings, heated enclosures and appurtenances; all related site work, piping, and any other activities incidental to the completion of this Project. An alternate bid is included for the demolition and replacement of all nine (9) existing check valves for the high-level and low-level pump station.