Work includes mobilization, traffic control, seeding and mulching, erosion control, incidental stone, complete in place 50 TN, stabilization stone as directed by engineer 50 TN, backflow preventor per cog std. 15 with above ground enclosure 1 EA, 8"x6" full body tapping sleeve, 6" tapping valve and mega-lug, complete in place 1 EA, bore and jack, including 16" steel emcasement pipe with. 250" min. wall thickness, 3 spiders per joint, and 6" restrained joint pipe, complete in place, 6" dip, class 50, including pipe, bedding, backfill, blocking, and testing; complete in place as directed by engineer 1,900 LF, 6" gate valve, including valve box and extention, complete in place as directed by engineer 2 EA. See attached file.
Available