Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide engineering services the multi-building mechanical systems improvements project, the requested services includes the evaluation and design of mechanical system upgrades across multiple zoo facilities including hvac replacements, building automation system (bas) upgrades and integration, and a new chiller system with associated photovoltaic (pv) infrastructure. Services will be performed under a professional services agreement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes installing a min split at the jrc building, disconnecting the old rtu units and salvaging them, then installing new rtu units, testing and balancing as well as disconnecting and reconnecting controls of each unit is also required.
Posted Date
Jan 10, 2026
Due Date
Jan 29, 2026
Release: Jan 10, 2026
Close: Jan 29, 2026
Work includes installing a min split at the jrc building, disconnecting the old rtu units and salvaging them, then installing new rtu units, testing and balancing as well as disconnecting and reconnecting controls of each unit is also required.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Building Improvements Project including all associated work required to install / repair same as shown in bid documents.
Posted Date
Jan 18, 2026
Due Date
Feb 26, 2026
Release: Jan 18, 2026
Close: Feb 26, 2026
Building Improvements Project including all associated work required to install / repair same as shown in bid documents.
AvailableScope of work includes the removal of the existing Motor Barn, existing concrete slab, footings, preparation and placement of new concrete improvements for the new Modular Building, installation of weatherproof materials for building, relocating existing electrical and camera systems as needed, and all items not mentioned but included in the specifications.
Posted Date
Jan 9, 2026
Due Date
Jan 29, 2026
Release: Jan 9, 2026
Close: Jan 29, 2026
Scope of work includes the removal of the existing Motor Barn, existing concrete slab, footings, preparation and placement of new concrete improvements for the new Modular Building, installation of weatherproof materials for building, relocating existing electrical and camera systems as needed, and all items not mentioned but included in the specifications.
AvailableHeadworks & Electric Improvements Project: Contract 2025-01 – General/Mechanical Construction; Contract 2025-02 – Electrical Construction. The Project includes the following Work: Removal of existing aeration systems within various treatment basins and their associated air piping systems. Selective demolition of support piers, metal walkways, and air piping within existing aeration basins. Construction of a new electrical control building. Installation of various aeration basin blowers, piping, air diffusers and associated equipment. Removal and replacement of existing mechanical screen and grit removal equipment within the Headworks Building.
Posted Date
Dec 10, 2025
Due Date
Jan 28, 2026
Release: Dec 10, 2025
Close: Jan 28, 2026
Headworks & Electric Improvements Project: Contract 2025-01 – General/Mechanical Construction; Contract 2025-02 – Electrical Construction. The Project includes the following Work: Removal of existing aeration systems within various treatment basins and their associated air piping systems. Selective demolition of support piers, metal walkways, and air piping within existing aeration basins. Construction of a new electrical control building. Installation of various aeration basin blowers, piping, air diffusers and associated equipment. Removal and replacement of existing mechanical screen and grit removal equipment within the Headworks Building.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →