Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide professional hearing examiner services, including but not limited to: conducting administrative hearings and/or mediations for petitions and appeals filed under the city's rent stabilization and just cause for eviction ordinance rent stabilization and good cause for eviction ordinance; reviewing petition/appeal information and data for accuracy and responding to staff's inquiries concerning particular petitions/appeals; researching and analyzing federal and state legislation and applicable case law affecting pending petitions/appeals; preparing settlement agreements; responding to written inquiries related to hearing decisions on assigned cases. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Consultants to assist in developing a rent stabilization analysis and program design.
Posted Date
Dec 18, 2025
Due Date
Jan 9, 2026
Release: Dec 18, 2025
Close: Jan 9, 2026
Consultants to assist in developing a rent stabilization analysis and program design.
AvailableMedical imaging equipment for medical examiners office.
Posted Date
Nov 20, 2025
Due Date
Dec 29, 2025
Release: Nov 20, 2025
Close: Dec 29, 2025
Medical imaging equipment for medical examiners office.
AvailableMedical imaging equipment for medical examiners office.
Posted Date
Nov 20, 2025
Due Date
Dec 29, 2025
Release: Nov 20, 2025
Close: Dec 29, 2025
Medical imaging equipment for medical examiners office.
AvailableProvide professional design and construction services for emergency slope stabilization. Providing both the engineering design and construction necessary to stabilize the slope, extend the existing retaining wall, and reestablish vegetation in the affected area. Perform slope stabilization for approximately 13,500 SF of affected area. Grading and excavation necessary to properly shape, stabilize and prepare the disturbed slope areas. Installation and maintenance of all required erosion and sediment control measures in accordance with Georgia law and local BMP standards. Extend the existing retaining wall approximately 40 feet to the west below the tanks. Reestablish vegetation on all disturbed areas upon completion of slope stabilization. Two applications of hydroseeding: the first immediately after completion of grading, and the second after initial germination or as needed to ensure full vegetation establishment.
Posted Date
Nov 26, 2025
Due Date
Dec 31, 2025
Release: Nov 26, 2025
Close: Dec 31, 2025
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide professional design and construction services for emergency slope stabilization. Providing both the engineering design and construction necessary to stabilize the slope, extend the existing retaining wall, and reestablish vegetation in the affected area. Perform slope stabilization for approximately 13,500 SF of affected area. Grading and excavation necessary to properly shape, stabilize and prepare the disturbed slope areas. Installation and maintenance of all required erosion and sediment control measures in accordance with Georgia law and local BMP standards. Extend the existing retaining wall approximately 40 feet to the west below the tanks. Reestablish vegetation on all disturbed areas upon completion of slope stabilization. Two applications of hydroseeding: the first immediately after completion of grading, and the second after initial germination or as needed to ensure full vegetation establishment.
Available