CityFL
Posted
Aug 7, 2026
Sep 23, 2026
Lake Wales Headworks Modification
Work includes removal and replacement of the existing headworks system, site piping, and electrical system; construction of new headworks system, platform walkway and stairs, piping modifications, site work demolition, dewatering, concrete support, concrete pad, electrical, instrumentation and controls; replacement of existing ras/was pumps, installation of an influent flow meter and variable frequency drives for the pump; installation of sludge holding tank jet mixing system, piping modifications, concrete support, concrete pad.
