Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes the replacement of six multi-rake bar screens, six bar screen channel influent slide gates, six main sewage pumps (msps), and two emergency dry pit dewatering pumps, along with all associated equipment. This also includes the installation of new intake and exhaust fans, as well as upgraded electrical and control systems.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The New York City Department of Environmental Protection (DEP) is soliciting competitive sealed bids for the Headworks Improvements project at the Oakwood Beach Wastewater Treatment Plant, including replacement of multi-rake bar screens, influent slide gates, main sewage pumps, emergency dewatering pumps, new intake/exhaust fans, and electrical/control upgrades. The solicitation is being released through PASSPort and vendors must submit responses via the PASSPort portal (EPIN 82625B0057). A pre-bid meeting via Microsoft Teams is scheduled for 2026-01-22; bids are due 2026-03-04 at 10:00 AM ET.
Posted Date
Jan 15, 2026
Due Date
Mar 4, 2026
Release: Jan 15, 2026
Close: Mar 4, 2026
The New York City Department of Environmental Protection (DEP) is soliciting competitive sealed bids for the Headworks Improvements project at the Oakwood Beach Wastewater Treatment Plant, including replacement of multi-rake bar screens, influent slide gates, main sewage pumps, emergency dewatering pumps, new intake/exhaust fans, and electrical/control upgrades. The solicitation is being released through PASSPort and vendors must submit responses via the PASSPort portal (EPIN 82625B0057). A pre-bid meeting via Microsoft Teams is scheduled for 2026-01-22; bids are due 2026-03-04 at 10:00 AM ET.
AvailableHeadworks & Electric Improvements Project: Contract 2025-01 – General/Mechanical Construction; Contract 2025-02 – Electrical Construction. The Project includes the following Work: Removal of existing aeration systems within various treatment basins and their associated air piping systems. Selective demolition of support piers, metal walkways, and air piping within existing aeration basins. Construction of a new electrical control building. Installation of various aeration basin blowers, piping, air diffusers and associated equipment. Removal and replacement of existing mechanical screen and grit removal equipment within the Headworks Building.
Posted Date
Dec 10, 2025
Due Date
Jan 28, 2026
Release: Dec 10, 2025
Close: Jan 28, 2026
Headworks & Electric Improvements Project: Contract 2025-01 – General/Mechanical Construction; Contract 2025-02 – Electrical Construction. The Project includes the following Work: Removal of existing aeration systems within various treatment basins and their associated air piping systems. Selective demolition of support piers, metal walkways, and air piping within existing aeration basins. Construction of a new electrical control building. Installation of various aeration basin blowers, piping, air diffusers and associated equipment. Removal and replacement of existing mechanical screen and grit removal equipment within the Headworks Building.
AvailableWork includes WWTP chemical phosporus removal improvements.
Posted Date
Jan 16, 2026
Due Date
Feb 6, 2026
Release: Jan 16, 2026
Close: Feb 6, 2026
Work includes WWTP chemical phosporus removal improvements.
AvailableWWTP process, disinfection and electrical improvements, Phase II.
Posted Date
Dec 2, 2025
Due Date
Jan 27, 2026
Release: Dec 2, 2025
Close: Jan 27, 2026
WWTP process, disinfection and electrical improvements, Phase II.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →