Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide the construction of the head works canopy. Work consists of but not limited to the following: equipment canopy: construction of an 80' x 100' pre- engineered galvanized steel building with 26' sidewalls. Building will have full height and width side and end wall and roof covered with P.B.R. Style metal panels and one end and side wall open. The enclosed side wall will have (2) 16'x14' overhead doors with an option of electric openers and (1) standard walk door. The building will have seismic engineered concrete pier foundation. Roof will have 2/12 pitch with gutters on both sides.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Headworks & Electric Improvements Project: Contract 2025-01 – General/Mechanical Construction; Contract 2025-02 – Electrical Construction. The Project includes the following Work: Removal of existing aeration systems within various treatment basins and their associated air piping systems. Selective demolition of support piers, metal walkways, and air piping within existing aeration basins. Construction of a new electrical control building. Installation of various aeration basin blowers, piping, air diffusers and associated equipment. Removal and replacement of existing mechanical screen and grit removal equipment within the Headworks Building.
Posted Date
Dec 10, 2025
Due Date
Jan 28, 2026
Release: Dec 10, 2025
Close: Jan 28, 2026
Headworks & Electric Improvements Project: Contract 2025-01 – General/Mechanical Construction; Contract 2025-02 – Electrical Construction. The Project includes the following Work: Removal of existing aeration systems within various treatment basins and their associated air piping systems. Selective demolition of support piers, metal walkways, and air piping within existing aeration basins. Construction of a new electrical control building. Installation of various aeration basin blowers, piping, air diffusers and associated equipment. Removal and replacement of existing mechanical screen and grit removal equipment within the Headworks Building.
AvailableEarhart canopy repairs.
Posted Date
Jan 19, 2026
Due Date
Feb 9, 2026
Release: Jan 19, 2026
Close: Feb 9, 2026
Earhart canopy repairs.
AvailableRelease, canopy, parachute; NSN 1670-006759008.
Posted Date
Dec 15, 2025
Due Date
Feb 27, 2026
Release: Dec 15, 2025
Close: Feb 27, 2026
Release, canopy, parachute; NSN 1670-006759008.
AvailableThe City of Tracy is soliciting sealed bids for the Headworks Bar Screen 1 Replacement (CIP 74170) at the Tracy Wastewater Treatment Plant. The work includes demolition of the existing bar screen No. 1 and procurement and installation of a new bar screen with all accessories and appurtenances, with a planned construction window of June–August 2026. Bid documents are available via QuestCDN and bids are due February 19, 2026, at 4:30 p.m. PT.
Posted Date
-
Due Date
Feb 20, 2026
Close: Feb 20, 2026
The City of Tracy is soliciting sealed bids for the Headworks Bar Screen 1 Replacement (CIP 74170) at the Tracy Wastewater Treatment Plant. The work includes demolition of the existing bar screen No. 1 and procurement and installation of a new bar screen with all accessories and appurtenances, with a planned construction window of June–August 2026. Bid documents are available via QuestCDN and bids are due February 19, 2026, at 4:30 p.m. PT.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis