School DistrictLA
Posted
Oct 21, 2026
Dec 4, 2026
Building Improvements RFP
Provide building improvements.
Description: Project consists of primarily exterior building envelope improvements and limited related interior improvements at the Main Campus; including selective demolition of general, mechanical, electrical trade work; unit masonry, cold-formed metal framing and metal fabrications, rough carpentry, sheathing and plastic paneling, thermal insulation, fluid applied air barriers, insulated metal panels and joint sealants, hollow metal doors and frames, overhead sectional doors, door hardware and glazing, interior and exterior painting, and miscellaneous related mechanical and electrical work.
HigherEducation · IL, US
Adjacent opportunities open for bidding right now.
School DistrictLA
Posted
Oct 21, 2026
Dec 4, 2026
Provide building improvements.
Higher EducationIL
Posted
Oct 22, 2026
Dec 3, 2026
Temperature Control work includes: a. Provide weekly on-site presence to perform the following tasks: (1) Address immediate deficiencies at the direction of the Facilities Management staff (2) Review and address the backlog of system alarms (3) Perform system performance checks and preventative maintenance tasks throughout the system (4) Manage the campus supervisory control system, which monitors the operation of DDC controllers in each building. This system uses Tridium Niagara software. (5) Perform software patches and updates to the Niagara server and to the network controllers in each building.
CityLA
Posted
Nov 11, 2026
Dec 10, 2026
Work includes: base bid: demolition of minor building and electrical items including steel walk door, sliding metal doors and tracks, overhead coiling doors, wall fan and hood, various metal building wall components, covered wood framed enclosure, plywood roof over portion of covered office, electric control panel, conduit, wiring, junction boxes, receptacles, lighting, etc. And the construction/installation of various metal building wall modifications/additions, steel walk doors, overhead coiling doors (electric and manual), spray foam on entire interior walls and ceiling, main electric panel, conduit, conductors, junction boxes, receptacles, lighting, automatic transfer switch, ceiling mounted hvls fans, ceiling mounted natural gas ceramic heaters, plywood roof decking (portion of covered office), extension of natural gas service from lake street (including meter and regulator), etc.
J. F. Drake State Technical College
Higher EducationAL
Posted
Oct 28, 2026
Mar 11, 2027
Work inlcudes north campus and building improvements, building 400 renovation & addition.
Decision makers connected to this RFP from Harper College.
Solicitation files and supporting documents for this bid.