CityNV
Posted
Sep 5, 2026
Sep 29, 2026
HARP Trail Extension
The City of Elko is soliciting bids from qualified contractors for the HARP Trail Extension beneath the 12th Street Bridge along the south side of the Humboldt River. The work includes trail construction, earthwork, asphalt paving, drainage, utility relocation, ditch maintenance, dust control, permitting, and inspections. Electronic bids are due through the procurement platform by September 29, 2026, at 2:30 PM Pacific, and attendance at the mandatory September 15, 2026, pre-bid meeting is required.