Retrieving RFP details
Release
Close
Town of Severance
Project includes the following work: new sidewalk construction and signal installation including removals, earthwork, grading, concrete sidewalk, pedestrian curb ramps, asphalt patching, signing, pavement markings, and drainage improvements within town of severance right of way.
Michigan Department of Technology, Management and Budget
0.53 mi of intersection reconstruction of a single lane roundabout, drainage improvements, sidewalk, lighting, signing and pavement markings at intersection.
City of Gaithersburg
Work includes side walk (removal and replacement), paver sidewalks, other associated works as listed on the schedule of prices, curb and gutter, paving. Maintenance of traffic; 600 lf temporary orange construction fence; 20 cy test pit excavation; 750 lf full depth saw cut; 5 lf "gutterbuddy" or approved equal; 60 sy remove, dispose & replace concrete sidewalk & wheelchair ramps (mc-110.01/.02); 4,100 sf remove (wavy), dispose & replace brick (belden pawnee blend) sidewalk (mc-111.02); 60 sy concrete sealant for curb, gutter and sidewalks; 30 cy furnish & install cast-in-place concrete - slot mix; 18 ea adjust existing water valves, sewer manholes; general excavation; 100 lf remove, dispose & replace concrete curb & gutter (all types-any height). See outside link.
Virginia Department of Transportation
Perform intersection improvements which include traffic control (detour), milling, paving, installation of a directional island, signage, and lane markers.
Release
Oct 17, 2025
Close
Nov 06, 2025