Metro Vancouver is soliciting construction services (RFP 25-084) for the replacement of the power distribution system at the Harbour Pump Station located within the Vancouver Fraser Port Authority in Vancouver. The scope of work includes installing, connecting, testing, and commissioning one Owner-pre-purchased outdoor Unit Substation (E-House) with medium voltage switchgear, decommissioning existing BC Hydro service switchgear/dry-type transformer/MCC, and supplying a new dry-type station transformer and Owner-pre-purchased MCC. Online proposal submissions are due by 2:00 PM PDT on July 3, 2026, with an 18-month contract duration.