CitySC
Posted
Oct 16, 2026
Jan 28, 2027
North Dale Drive Drainage System Improvements (Request for Proposal)
The project t includes the complete installation of 580 LF of 24” HDPE drain line. Included in this installation is 5 catch basins along with aprons to accept the stormwater runoff from the roadway section. The connection to the existing catch basin shall be at the southerly side of the entrance to the existing commercial use. As installation of the drain line progresses, it will be necessary to remove the existing line. In the event that there is a conflict with existing sewer services the contactor shall replace the service affected. There will be one roadway patch of approximately 40’ in length. The contactor shall backfill the trench and install an asphalt patch of 8” stone base and 3” of asphalt surface. The contractor shall also install three (3) residential driveway patches, 6” stone base and 2” surface course, one commercial driveway 8” stone base and 3” asphalt surface course. The contractor shall ensure that the existing drain line has been totally removed, and that grass is in sown over the disturbed areas. The contractor shall minimize disturbance to the residential yards and ensure that the last 4” of the backfill be screened topsoil, without rocks or large clumps.
