Liberty Street Storm Sewer Improvements
Work consists of: 6 EA, PADot Type 4 inlet; 45 LF, 15" HDPE Type N-12; 575 LF, 24" HDPE Type N-12.
Description: Work includes Erosion Control and Water Pollution Prevention, Trench Excavation Safety Systems, 10 CY of Unsuitable Excavation, Project Temporary Traffic Control, 1 LS of Locate Existing Utilities, 280 LF of 24-Inch HDPE DR 17 Sewer Force Main and Fittings (Incl. Bedding), 65 LF of Slipline HDPE DR 17 Sanitary Sewer Pipe, 8 In. Diam. , Connecting to Existing System, 10 CY of Foundation Gravel , 165 ton of HMA Restoration, Cl. 1/2" PG 58H-22,Temporary Bypass Pumping Dewatering, Manhole, 48 In. Diam. 2 ea.
City · WA, US
Original attachments and procurement documents tied to this bid.
Procurement and program contacts connected to City of Aberdeen.
These related opportunities are still open for bidding.
Aug 15, 2026
Closes
Aug 28, 2026
Work consists of: 6 EA, PADot Type 4 inlet; 45 LF, 15" HDPE Type N-12; 575 LF, 24" HDPE Type N-12.
CityCA
Aug 16, 2026
Closes
Sep 10, 2026
Project consists, in general, of: replacement of existing 6" pvc sewer main with 8" hdpe.
CityOH
-
Closes
Sep 16, 2026
City of Columbus Public Utilities posted an IFB, rather than a grant program, for the Kent Fairwood Storm Sewer Improvements & Gault Street Waterline Improvements project. The matching project description says the green-infrastructure work will construct 35 rain gardens in several locations throughout the project area. The estimated construction cost is approximately $8.5 million, with construction anticipated to begin in the fourth quarter of 2026 and substantial completion within 540 days.
CityGA
Aug 5, 2026
Closes
Sep 3, 2026
Installation of approx. 1,300 LF of new 8" PVC sanitary sewer main via open cut trench & pipe bursting; including manhole replacement, by-pass pumping, surface restoration, erosion/sediment control measures.