Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Bridge replacement work includes approx. 785 CY drainage excavation, 435 TN asphalt concrete, 82 SY 15" pavement patching, 739 INLF saw cutting, 100 LF guardrail transitions, 196 LF barbed wire fence, 326 SY erosion control system, 32 LB seeding, 03247 Mile rumble strips, 24 SF sign, 0.584 Mile plastic pavement striping, 1,300 LF 18" precast concrete piles.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Bridge replacement work includes approx. 1 LS clearing & grubbing, 84 CY drainage excavation, 436.7 TN asphalt concrete, 1,080 SY milling, 102 SY 16.5" pavement patching, 100 LF guardrail transitions, 59 SY erosion control system, 0.44 AC hydro-seeding, 0.1 Mile rumble strips, 1,080 INLF saw cutting asphalt pavement, 0.161 Mile 4" plastic pavement striping.
Posted Date
Dec 16, 2025
Due Date
Jan 14, 2026
Release: Dec 16, 2025
Close: Jan 14, 2026
Bridge replacement work includes approx. 1 LS clearing & grubbing, 84 CY drainage excavation, 436.7 TN asphalt concrete, 1,080 SY milling, 102 SY 16.5" pavement patching, 100 LF guardrail transitions, 59 SY erosion control system, 0.44 AC hydro-seeding, 0.1 Mile rumble strips, 1,080 INLF saw cutting asphalt pavement, 0.161 Mile 4" plastic pavement striping.
AvailableReplacement of Bridge
Posted Date
-
Due Date
Feb 2, 2026
Release: -
Close: Feb 2, 2026
Replacement of Bridge
AvailableBridge rail replacement.
Posted Date
Dec 15, 2025
Due Date
Jan 22, 2026
Release: Dec 15, 2025
Close: Jan 22, 2026
Bridge rail replacement.
AvailableHarford County DPW - Engineering (IFB #26-180) is soliciting bids to replace Bridge H-066x on Boggs Road over Long Branch, including removal of the existing bridge and construction of a new single-span structure with associated stream restoration, scour protection, and approach roadway reconstruction. Bidders must be prequalified for J1 (Structures - Bridges); a pre-bid meeting is scheduled and questions are due prior to the Jan 14, 2026 submission deadline.
Posted Date
Nov 25, 2025
Due Date
Jan 14, 2026
Release: Nov 25, 2025
Close: Jan 14, 2026
Harford County DPW - Engineering (IFB #26-180) is soliciting bids to replace Bridge H-066x on Boggs Road over Long Branch, including removal of the existing bridge and construction of a new single-span structure with associated stream restoration, scour protection, and approach roadway reconstruction. Bidders must be prequalified for J1 (Structures - Bridges); a pre-bid meeting is scheduled and questions are due prior to the Jan 14, 2026 submission deadline.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis