Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes onstruction of approx 240 LF of 8", 200 LF of 12", 160 LF of 18", 6,180 LF of 30", and 1,430 LF of 48" DIP gravity sewer main, 46 manholes, 260 LF of 48" steel casing jack and bore installation, 377 LF of relining sewers – 18" CIPP, restoration of all disturbed areas to pre-construction conditions.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Memorial Point Utility District in Texas is soliciting bids for Phase 2 sanitary sewer cleaning and closed-circuit television (CCTV) inspection services. The project includes providing labor, equipment, and all associated work per the specifications to clean and televise designated sanitary sewer segments. Bids are due on January 27, 2026 via the buyer’s e-bidding portal.
Posted Date
Jan 9, 2026
Due Date
Jan 27, 2026
Release: Jan 9, 2026
Close: Jan 27, 2026
Memorial Point Utility District in Texas is soliciting bids for Phase 2 sanitary sewer cleaning and closed-circuit television (CCTV) inspection services. The project includes providing labor, equipment, and all associated work per the specifications to clean and televise designated sanitary sewer segments. Bids are due on January 27, 2026 via the buyer’s e-bidding portal.
AvailableWork include Rehabilitate approximately 13,829 feet of sanitary sewer with cured-in-place pipe lining, including 32 manholes and 104 sanitary laterals. Replace approximately 1,559 feet of sanitary sewer, including 8 manholes and 20 sewer laterals. Install approximately 900 feet of new water lines. And full-depth replacement of approximately 900 feet of roadway
Posted Date
Jan 16, 2026
Due Date
Feb 6, 2026
Release: Jan 16, 2026
Close: Feb 6, 2026
Work include Rehabilitate approximately 13,829 feet of sanitary sewer with cured-in-place pipe lining, including 32 manholes and 104 sanitary laterals. Replace approximately 1,559 feet of sanitary sewer, including 8 manholes and 20 sewer laterals. Install approximately 900 feet of new water lines. And full-depth replacement of approximately 900 feet of roadway
AvailableThis RFP is for the rehabilitation of the sewer system and pump station No. 3.
Posted Date
Dec 12, 2025
Due Date
Jan 26, 2026
Release: Dec 12, 2025
Close: Jan 26, 2026
This RFP is for the rehabilitation of the sewer system and pump station No. 3.
Work includes 2,250 LF portland cement concrete sidewalk replacement; 622 LF portland cement concrete curb and gutter replacement; 2,200 LF 8" pvc sanitary sewer main replace existing in place (open trench); 2 EA install new sanitary sewer manhole in new location; 5 EA remove and replace existing sanitary sewer manhole in place; 1 LS remove sanitary sewer rodding inlet; 3 EA sanitary sewer main connection to existing manhole; 1 EA existing sanitary sewer manhole rehabiiltation; 43 EA 4" sanitary sewer lateral, cleanout, and box replacement (open trench). See attached file.
Posted Date
Jan 13, 2026
Due Date
Feb 17, 2026
Release: Jan 13, 2026
Close: Feb 17, 2026
Work includes 2,250 LF portland cement concrete sidewalk replacement; 622 LF portland cement concrete curb and gutter replacement; 2,200 LF 8" pvc sanitary sewer main replace existing in place (open trench); 2 EA install new sanitary sewer manhole in new location; 5 EA remove and replace existing sanitary sewer manhole in place; 1 LS remove sanitary sewer rodding inlet; 3 EA sanitary sewer main connection to existing manhole; 1 EA existing sanitary sewer manhole rehabiiltation; 43 EA 4" sanitary sewer lateral, cleanout, and box replacement (open trench). See attached file.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis