CityAR
Posted
Sep 6, 2026
Oct 1, 2026
Guy City Park Trail Improvements
Provide city park trail improvements. The project will overlay an existing chip seal trail located in the city park.
Description: The active construction project titled Guy Grant Trail (CSJ 0913-27-109; Project ID A00219538) involves designing and constructing a shared-use path along off-road drainage corridors between Guy Grant Road and the Lone Tree Creek Trail, plus work on Vicksburg Drive. The project includes a pedestrian bridge, pedestrian beacon, crosswalks, ADA ramps, lighting, and signage, and is scheduled for an estimated letting on June 1, 2027. The City of Victoria identifies the project as funded through TxDOT’s Transportation Alternative grant program, but the solicitation itself is for construction services rather than administration of or applications for a grant program.
StateAgency · TX, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityAR
Posted
Sep 6, 2026
Oct 1, 2026
Provide city park trail improvements. The project will overlay an existing chip seal trail located in the city park.
CityTX
Posted
Sep 13, 2026
Oct 2, 2026
Project includes approx. 4,250 LF of 30" Sanitary Sewer Main by Cured-In-Place Pipe; 4,675 LF of 8" PVC, C-900, DR-18 Water Line (Asphalt Paved Areas) (Including HMAC Pavement Repair); 100 LF of 16" Steel Casing (Installed by Boring) (Includes Pavement Repair of Bore Pits); 15 EA of Water Service (Long Side) (1" service line with 3/4" Meter).
CityCO
Posted
Sep 1, 2026
Sep 23, 2026
Project will consist of a multi-use trail including grading and drainage, ADA compliant access points, and integration with existing infrastructure.
CountyWI
Posted
Sep 17, 2026
Sep 21, 2026
Work under this project shall consist of preparation and construction activities including, but not limited to, stump removal, clearing and grubbing, ground leveling/grading, installation and placement of trail materials, drainage improvements, and final trail shaping.
Decision makers connected to this RFP from Texas Department of Transportation.