Work includes approx. 1 LS mobilization; 1 LS clearing & grubbing; 2,683 CY unclassified excavation; 21.400 SY 12" UNIF pavement patching; 1,973 SY milling existing asphalt pavement; 11,344 LF pavement markings; 304 SF permanent construction signs; 100 LF 1" PVC conduit; 1 EA electrical service for traffic signal; 4 EA install aluminum pedestal pole concrete foundation; 520 LF 18" RC pipe culvert; 1 EA manhole; 182 LF concrete curb and gutter; 319 SY geotextile for erosion control; 146 LB fertilizer(nitrogen); 4.404 AC mowing; 263 LF 8" DR9 HDPE water main by directional boring; 65 LF roadway crossing by jack and bore; 1,604 LF 6" DI water main; 2 EA 6" gate valve; 18 EA 384" service connection; 50 CY trench rock excavation.