Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes guardrail & guardrail end anchors.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Purchase of guardrail end treatments, impact attenuators, sand barrels and their associated repair parts.
Posted Date
Dec 26, 2025
Due Date
Jan 13, 2026
Release: Dec 26, 2025
Close: Jan 13, 2026
Purchase of guardrail end treatments, impact attenuators, sand barrels and their associated repair parts.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 3 EA. guardrail, special anchor section; 18,169 LF high tension cable guardrail; 50 EA. high tension cable guardrail end anchor; 8 EA. high tension cable guardrail spare parts kit.
Posted Date
Dec 9, 2025
Due Date
Jan 21, 2026
Release: Dec 9, 2025
Close: Jan 21, 2026
Work includes 3 EA. guardrail, special anchor section; 18,169 LF high tension cable guardrail; 50 EA. high tension cable guardrail end anchor; 8 EA. high tension cable guardrail spare parts kit.
AvailableGuardrail repair/replacement.
Posted Date
Dec 24, 2025
Due Date
Jan 15, 2026
Release: Dec 24, 2025
Close: Jan 15, 2026
Guardrail repair/replacement.
AvailableWork includes installation guardrail (includes all components); removal / disposal of existing guardrail; resetting guardrail (single face); realignment of existing guardrail; guardrail panel - transition panel from thrie-beam to w-beam; guardrail panel - shop bent radius (replace); guardrail posts (timber) (replace in asphalt); guardrail posts (timber) (replace in soil); guardrail posts (special steel); guardrail posts (special steel) - concrete structure mount; guardrail posts (encased); guardrail - pipe safety rub rail (backside of guardrail); offset blocks (steel block); offset blocks (composite block, rubber, plastic). See outside link.
Posted Date
Nov 3, 2025
Due Date
Jan 23, 2026
Release: Nov 3, 2025
Close: Jan 23, 2026
Work includes installation guardrail (includes all components); removal / disposal of existing guardrail; resetting guardrail (single face); realignment of existing guardrail; guardrail panel - transition panel from thrie-beam to w-beam; guardrail panel - shop bent radius (replace); guardrail posts (timber) (replace in asphalt); guardrail posts (timber) (replace in soil); guardrail posts (special steel); guardrail posts (special steel) - concrete structure mount; guardrail posts (encased); guardrail - pipe safety rub rail (backside of guardrail); offset blocks (steel block); offset blocks (composite block, rubber, plastic). See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →